Cargando…

Procedures and results of the high voltage tests performed in March 2009 on the PS Booster main ring magnets.

The last high voltage test (Fig 1) for the PSB was conducted in 1997. In view of the LHC operation starting later in the year a repeat of this high voltage test has been conducted during the hardware test period (March 2009) to verify the ground insulation of the PSB main magnet circuits

Detalles Bibliográficos
Autor principal: Newborough, A
Lenguaje:eng
Publicado: 2009
Materias:
Acceso en línea:http://cds.cern.ch/record/1206238
_version_ 1780917928220164096
author Newborough, A
author_facet Newborough, A
author_sort Newborough, A
collection CERN
description The last high voltage test (Fig 1) for the PSB was conducted in 1997. In view of the LHC operation starting later in the year a repeat of this high voltage test has been conducted during the hardware test period (March 2009) to verify the ground insulation of the PSB main magnet circuits
id cern-1206238
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2009
record_format invenio
spelling cern-12062382019-09-30T06:29:59Zhttp://cds.cern.ch/record/1206238engNewborough, AProcedures and results of the high voltage tests performed in March 2009 on the PS Booster main ring magnets.Detectors and Experimental TechniquesThe last high voltage test (Fig 1) for the PSB was conducted in 1997. In view of the LHC operation starting later in the year a repeat of this high voltage test has been conducted during the hardware test period (March 2009) to verify the ground insulation of the PSB main magnet circuitsCERN-TE-Note-2009-005oai:cds.cern.ch:12062382009-09-11
spellingShingle Detectors and Experimental Techniques
Newborough, A
Procedures and results of the high voltage tests performed in March 2009 on the PS Booster main ring magnets.
title Procedures and results of the high voltage tests performed in March 2009 on the PS Booster main ring magnets.
title_full Procedures and results of the high voltage tests performed in March 2009 on the PS Booster main ring magnets.
title_fullStr Procedures and results of the high voltage tests performed in March 2009 on the PS Booster main ring magnets.
title_full_unstemmed Procedures and results of the high voltage tests performed in March 2009 on the PS Booster main ring magnets.
title_short Procedures and results of the high voltage tests performed in March 2009 on the PS Booster main ring magnets.
title_sort procedures and results of the high voltage tests performed in march 2009 on the ps booster main ring magnets.
topic Detectors and Experimental Techniques
url http://cds.cern.ch/record/1206238
work_keys_str_mv AT newborougha proceduresandresultsofthehighvoltagetestsperformedinmarch2009onthepsboostermainringmagnets