Cargando…
Procedures and results of the high voltage tests performed in March 2009 on the PS Booster main ring magnets.
The last high voltage test (Fig 1) for the PSB was conducted in 1997. In view of the LHC operation starting later in the year a repeat of this high voltage test has been conducted during the hardware test period (March 2009) to verify the ground insulation of the PSB main magnet circuits
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1206238 |
_version_ | 1780917928220164096 |
---|---|
author | Newborough, A |
author_facet | Newborough, A |
author_sort | Newborough, A |
collection | CERN |
description | The last high voltage test (Fig 1) for the PSB was conducted in 1997. In view of the LHC operation starting later in the year a repeat of this high voltage test has been conducted during the hardware test period (March 2009) to verify the ground insulation of the PSB main magnet circuits |
id | cern-1206238 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2009 |
record_format | invenio |
spelling | cern-12062382019-09-30T06:29:59Zhttp://cds.cern.ch/record/1206238engNewborough, AProcedures and results of the high voltage tests performed in March 2009 on the PS Booster main ring magnets.Detectors and Experimental TechniquesThe last high voltage test (Fig 1) for the PSB was conducted in 1997. In view of the LHC operation starting later in the year a repeat of this high voltage test has been conducted during the hardware test period (March 2009) to verify the ground insulation of the PSB main magnet circuitsCERN-TE-Note-2009-005oai:cds.cern.ch:12062382009-09-11 |
spellingShingle | Detectors and Experimental Techniques Newborough, A Procedures and results of the high voltage tests performed in March 2009 on the PS Booster main ring magnets. |
title | Procedures and results of the high voltage tests performed in March 2009 on the PS Booster main ring magnets. |
title_full | Procedures and results of the high voltage tests performed in March 2009 on the PS Booster main ring magnets. |
title_fullStr | Procedures and results of the high voltage tests performed in March 2009 on the PS Booster main ring magnets. |
title_full_unstemmed | Procedures and results of the high voltage tests performed in March 2009 on the PS Booster main ring magnets. |
title_short | Procedures and results of the high voltage tests performed in March 2009 on the PS Booster main ring magnets. |
title_sort | procedures and results of the high voltage tests performed in march 2009 on the ps booster main ring magnets. |
topic | Detectors and Experimental Techniques |
url | http://cds.cern.ch/record/1206238 |
work_keys_str_mv | AT newborougha proceduresandresultsofthehighvoltagetestsperformedinmarch2009onthepsboostermainringmagnets |