Cargando…
Procedures and results of the high voltage tests performed in March 2009 on the PS Booster main ring magnets.
The last high voltage test (Fig 1) for the PSB was conducted in 1997. In view of the LHC operation starting later in the year a repeat of this high voltage test has been conducted during the hardware test period (March 2009) to verify the ground insulation of the PSB main magnet circuits
Autor principal: | Newborough, A |
---|---|
Lenguaje: | eng |
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1206238 |
Ejemplares similares
-
The PS booster main bending magnets and quadrupole lenses
por: Asner, Alfred M, et al.
Publicado: (1970) -
Pre booster/first holding ring magnets
por: Moisio, M
Publicado: (1989) -
The ISOLDE facility at the CERN PS Booster
por: Kugler, E
Publicado: (1993) -
The CERN PS-Booster power supply
por: CERN. Geneva. Super Proton Synchrotron Division (SPS)
Publicado: (1974) -
Injection and acceleration in an ISR-Type main ring from the EHF 9 GeV/25 Hz Booster
por: Schönauer, Horst Otto
Publicado: (1987)