Cargando…
Measurement of the time resolution of the installed muon chambers with the 2008 cosmic runs
One of the main goals of the LHCb muon system commissioning is to access the detector performance and identify possible misbehaviors in the installed chambers: this is partially possible using cosmic ray muons tracked through the detector. In this note we focus on the measurement of the time resolut...
Autores principales: | Bonivento, W, Dettori, E, Manca, G, Oldeman, R, Sireus, M, Graziani, G, Passaleva, G |
---|---|
Lenguaje: | eng |
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1207335 |
Ejemplares similares
-
Measurement of the logical pad cluster size of the installed muon chambers with the 2008 cosmic runs
por: Bonivento, W, et al.
Publicado: (2009) -
Test with cosmic rays of the GEM chambers for the LHCb muon system produced in Cagliari
por: Bonivento, W, et al.
Publicado: (2007) -
Aligning the CMS muon chambers with the muon alignment system during an extended cosmic ray run
por: Chatrchyan, S, et al.
Publicado: (2009) -
Measurement of the time alignment between muon detector and calorimeters with the 2008 cosmic runs
por: Frosini, M
Publicado: (2009) -
Performance of the LHCb muon system with cosmic rays
por: Anelli, M., et al.
Publicado: (2010)