Information Management within the LHC Hardware Commissioning Project
The core task of the commissioning of the LHC technical systems was the individual test of the 1572 superconducting circuits of the collider, the powering tests. The two objectives of these tests were the validation of the different sub-systems making each superconducting circuit as well as the vali...
Autores principales: | , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1211025 |
_version_ | 1780918013315252224 |
---|---|
author | Bellesia, B Fernández-Robles, C Koratzinos, M Marqueta Barbero, A Pojer, M Saban, R Schmidt, R Solfaroli Camilloci, M Szkutnik, J Vergara Fernández, A Wenninger, J Zerlauth, M |
author_facet | Bellesia, B Fernández-Robles, C Koratzinos, M Marqueta Barbero, A Pojer, M Saban, R Schmidt, R Solfaroli Camilloci, M Szkutnik, J Vergara Fernández, A Wenninger, J Zerlauth, M |
author_sort | Bellesia, B |
collection | CERN |
description | The core task of the commissioning of the LHC technical systems was the individual test of the 1572 superconducting circuits of the collider, the powering tests. The two objectives of these tests were the validation of the different sub-systems making each superconducting circuit as well as the validation of the superconducting elements of the circuits in their final configuration in the tunnel. A wide set of software applications were developed by the team in charge of coordinating the powering activities (Hardware Commissioning Coordination) in order to manage the amount of information required for the preparation, execution and traceability of the tests. In all the cases special care was taken in order to keep the tools consistent with the LHC quality assurance policy, avoid redundancies between applications, ensure integrity and coherence of the test results and optimise their usability within an accelerator operation environment. This paper describes the main characteristics of these tools; it details their positive impact on the completion on time of the LHC Hardware Commissioning Project and presents usage being envisaged during the coming years of operation of the LHC. |
id | cern-1211025 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2009 |
record_format | invenio |
spelling | cern-12110252019-09-30T06:29:59Zhttp://cds.cern.ch/record/1211025engBellesia, BFernández-Robles, CKoratzinos, MMarqueta Barbero, APojer, MSaban, RSchmidt, RSolfaroli Camilloci, MSzkutnik, JVergara Fernández, AWenninger, JZerlauth, MInformation Management within the LHC Hardware Commissioning ProjectAccelerators and Storage RingsThe core task of the commissioning of the LHC technical systems was the individual test of the 1572 superconducting circuits of the collider, the powering tests. The two objectives of these tests were the validation of the different sub-systems making each superconducting circuit as well as the validation of the superconducting elements of the circuits in their final configuration in the tunnel. A wide set of software applications were developed by the team in charge of coordinating the powering activities (Hardware Commissioning Coordination) in order to manage the amount of information required for the preparation, execution and traceability of the tests. In all the cases special care was taken in order to keep the tools consistent with the LHC quality assurance policy, avoid redundancies between applications, ensure integrity and coherence of the test results and optimise their usability within an accelerator operation environment. This paper describes the main characteristics of these tools; it details their positive impact on the completion on time of the LHC Hardware Commissioning Project and presents usage being envisaged during the coming years of operation of the LHC.CERN-ATS-2009-059oai:cds.cern.ch:12110252009-05-04 |
spellingShingle | Accelerators and Storage Rings Bellesia, B Fernández-Robles, C Koratzinos, M Marqueta Barbero, A Pojer, M Saban, R Schmidt, R Solfaroli Camilloci, M Szkutnik, J Vergara Fernández, A Wenninger, J Zerlauth, M Information Management within the LHC Hardware Commissioning Project |
title | Information Management within the LHC Hardware Commissioning Project |
title_full | Information Management within the LHC Hardware Commissioning Project |
title_fullStr | Information Management within the LHC Hardware Commissioning Project |
title_full_unstemmed | Information Management within the LHC Hardware Commissioning Project |
title_short | Information Management within the LHC Hardware Commissioning Project |
title_sort | information management within the lhc hardware commissioning project |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1211025 |
work_keys_str_mv | AT bellesiab informationmanagementwithinthelhchardwarecommissioningproject AT fernandezroblesc informationmanagementwithinthelhchardwarecommissioningproject AT koratzinosm informationmanagementwithinthelhchardwarecommissioningproject AT marquetabarberoa informationmanagementwithinthelhchardwarecommissioningproject AT pojerm informationmanagementwithinthelhchardwarecommissioningproject AT sabanr informationmanagementwithinthelhchardwarecommissioningproject AT schmidtr informationmanagementwithinthelhchardwarecommissioningproject AT solfarolicamillocim informationmanagementwithinthelhchardwarecommissioningproject AT szkutnikj informationmanagementwithinthelhchardwarecommissioningproject AT vergarafernandeza informationmanagementwithinthelhchardwarecommissioningproject AT wenningerj informationmanagementwithinthelhchardwarecommissioningproject AT zerlauthm informationmanagementwithinthelhchardwarecommissioningproject |