Cargando…

First Beam Commissioning of the 400 MHz LHC RF System

Hardware commissioning of the LHC RF system was successfully completed in time for first beams in LHC in September 2008. All cavities ware conditioned to nominal field, power systems tested and all Low level synchronization systems, cavity controllers and beam control electronics were tested and cal...

Descripción completa

Detalles Bibliográficos
Autores principales: Butterworth, A C, Angoletta, M E, Arnaudon, L, Baudrenghien, P, Bohl, T, Brunner, O, Ciapala, Edmond, Dubouchet, F, Höfle, Wolfgang, Linnecar, T P R, Maesen, P, Molendijk, J C, Shaposhnikova, E N, Tückmantel, Joachim, Valuch, D, Wehrle, U, Weierud, F
Lenguaje:eng
Publicado: 2009
Materias:
Acceso en línea:http://cds.cern.ch/record/1212921
_version_ 1780918043118927872
author Butterworth, A C
Angoletta, M E
Arnaudon, L
Baudrenghien, P
Bohl, T
Brunner, O
Ciapala, Edmond
Dubouchet, F
Höfle, Wolfgang
Linnecar, T P R
Maesen, P
Molendijk, J C
Shaposhnikova, E N
Tückmantel, Joachim
Valuch, D
Wehrle, U
Weierud, F
author_facet Butterworth, A C
Angoletta, M E
Arnaudon, L
Baudrenghien, P
Bohl, T
Brunner, O
Ciapala, Edmond
Dubouchet, F
Höfle, Wolfgang
Linnecar, T P R
Maesen, P
Molendijk, J C
Shaposhnikova, E N
Tückmantel, Joachim
Valuch, D
Wehrle, U
Weierud, F
author_sort Butterworth, A C
collection CERN
description Hardware commissioning of the LHC RF system was successfully completed in time for first beams in LHC in September 2008. All cavities ware conditioned to nominal field, power systems tested and all Low level synchronization systems, cavity controllers and beam control electronics were tested and calibrated. Beam was successfully captured in ring 2, cavities phased, and a number of initial measurements made. These results are presented and tests and preparation for colliding beams in 2009 are outlined.
id cern-1212921
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2009
record_format invenio
spelling cern-12129212019-09-30T06:29:59Zhttp://cds.cern.ch/record/1212921engButterworth, A CAngoletta, M EArnaudon, LBaudrenghien, PBohl, TBrunner, OCiapala, EdmondDubouchet, FHöfle, WolfgangLinnecar, T P RMaesen, PMolendijk, J CShaposhnikova, E NTückmantel, JoachimValuch, DWehrle, UWeierud, FFirst Beam Commissioning of the 400 MHz LHC RF SystemAccelerators and Storage RingsHardware commissioning of the LHC RF system was successfully completed in time for first beams in LHC in September 2008. All cavities ware conditioned to nominal field, power systems tested and all Low level synchronization systems, cavity controllers and beam control electronics were tested and calibrated. Beam was successfully captured in ring 2, cavities phased, and a number of initial measurements made. These results are presented and tests and preparation for colliding beams in 2009 are outlined.CERN-ATS-2009-078oai:cds.cern.ch:12129212009-05-04
spellingShingle Accelerators and Storage Rings
Butterworth, A C
Angoletta, M E
Arnaudon, L
Baudrenghien, P
Bohl, T
Brunner, O
Ciapala, Edmond
Dubouchet, F
Höfle, Wolfgang
Linnecar, T P R
Maesen, P
Molendijk, J C
Shaposhnikova, E N
Tückmantel, Joachim
Valuch, D
Wehrle, U
Weierud, F
First Beam Commissioning of the 400 MHz LHC RF System
title First Beam Commissioning of the 400 MHz LHC RF System
title_full First Beam Commissioning of the 400 MHz LHC RF System
title_fullStr First Beam Commissioning of the 400 MHz LHC RF System
title_full_unstemmed First Beam Commissioning of the 400 MHz LHC RF System
title_short First Beam Commissioning of the 400 MHz LHC RF System
title_sort first beam commissioning of the 400 mhz lhc rf system
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1212921
work_keys_str_mv AT butterworthac firstbeamcommissioningofthe400mhzlhcrfsystem
AT angolettame firstbeamcommissioningofthe400mhzlhcrfsystem
AT arnaudonl firstbeamcommissioningofthe400mhzlhcrfsystem
AT baudrenghienp firstbeamcommissioningofthe400mhzlhcrfsystem
AT bohlt firstbeamcommissioningofthe400mhzlhcrfsystem
AT brunnero firstbeamcommissioningofthe400mhzlhcrfsystem
AT ciapalaedmond firstbeamcommissioningofthe400mhzlhcrfsystem
AT dubouchetf firstbeamcommissioningofthe400mhzlhcrfsystem
AT hoflewolfgang firstbeamcommissioningofthe400mhzlhcrfsystem
AT linnecartpr firstbeamcommissioningofthe400mhzlhcrfsystem
AT maesenp firstbeamcommissioningofthe400mhzlhcrfsystem
AT molendijkjc firstbeamcommissioningofthe400mhzlhcrfsystem
AT shaposhnikovaen firstbeamcommissioningofthe400mhzlhcrfsystem
AT tuckmanteljoachim firstbeamcommissioningofthe400mhzlhcrfsystem
AT valuchd firstbeamcommissioningofthe400mhzlhcrfsystem
AT wehrleu firstbeamcommissioningofthe400mhzlhcrfsystem
AT weierudf firstbeamcommissioningofthe400mhzlhcrfsystem