First Beam Commissioning of the 400 MHz LHC RF System
Hardware commissioning of the LHC RF system was successfully completed in time for first beams in LHC in September 2008. All cavities ware conditioned to nominal field, power systems tested and all Low level synchronization systems, cavity controllers and beam control electronics were tested and cal...
Autores principales: | , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1212921 |
_version_ | 1780918043118927872 |
---|---|
author | Butterworth, A C Angoletta, M E Arnaudon, L Baudrenghien, P Bohl, T Brunner, O Ciapala, Edmond Dubouchet, F Höfle, Wolfgang Linnecar, T P R Maesen, P Molendijk, J C Shaposhnikova, E N Tückmantel, Joachim Valuch, D Wehrle, U Weierud, F |
author_facet | Butterworth, A C Angoletta, M E Arnaudon, L Baudrenghien, P Bohl, T Brunner, O Ciapala, Edmond Dubouchet, F Höfle, Wolfgang Linnecar, T P R Maesen, P Molendijk, J C Shaposhnikova, E N Tückmantel, Joachim Valuch, D Wehrle, U Weierud, F |
author_sort | Butterworth, A C |
collection | CERN |
description | Hardware commissioning of the LHC RF system was successfully completed in time for first beams in LHC in September 2008. All cavities ware conditioned to nominal field, power systems tested and all Low level synchronization systems, cavity controllers and beam control electronics were tested and calibrated. Beam was successfully captured in ring 2, cavities phased, and a number of initial measurements made. These results are presented and tests and preparation for colliding beams in 2009 are outlined. |
id | cern-1212921 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2009 |
record_format | invenio |
spelling | cern-12129212019-09-30T06:29:59Zhttp://cds.cern.ch/record/1212921engButterworth, A CAngoletta, M EArnaudon, LBaudrenghien, PBohl, TBrunner, OCiapala, EdmondDubouchet, FHöfle, WolfgangLinnecar, T P RMaesen, PMolendijk, J CShaposhnikova, E NTückmantel, JoachimValuch, DWehrle, UWeierud, FFirst Beam Commissioning of the 400 MHz LHC RF SystemAccelerators and Storage RingsHardware commissioning of the LHC RF system was successfully completed in time for first beams in LHC in September 2008. All cavities ware conditioned to nominal field, power systems tested and all Low level synchronization systems, cavity controllers and beam control electronics were tested and calibrated. Beam was successfully captured in ring 2, cavities phased, and a number of initial measurements made. These results are presented and tests and preparation for colliding beams in 2009 are outlined.CERN-ATS-2009-078oai:cds.cern.ch:12129212009-05-04 |
spellingShingle | Accelerators and Storage Rings Butterworth, A C Angoletta, M E Arnaudon, L Baudrenghien, P Bohl, T Brunner, O Ciapala, Edmond Dubouchet, F Höfle, Wolfgang Linnecar, T P R Maesen, P Molendijk, J C Shaposhnikova, E N Tückmantel, Joachim Valuch, D Wehrle, U Weierud, F First Beam Commissioning of the 400 MHz LHC RF System |
title | First Beam Commissioning of the 400 MHz LHC RF System |
title_full | First Beam Commissioning of the 400 MHz LHC RF System |
title_fullStr | First Beam Commissioning of the 400 MHz LHC RF System |
title_full_unstemmed | First Beam Commissioning of the 400 MHz LHC RF System |
title_short | First Beam Commissioning of the 400 MHz LHC RF System |
title_sort | first beam commissioning of the 400 mhz lhc rf system |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1212921 |
work_keys_str_mv | AT butterworthac firstbeamcommissioningofthe400mhzlhcrfsystem AT angolettame firstbeamcommissioningofthe400mhzlhcrfsystem AT arnaudonl firstbeamcommissioningofthe400mhzlhcrfsystem AT baudrenghienp firstbeamcommissioningofthe400mhzlhcrfsystem AT bohlt firstbeamcommissioningofthe400mhzlhcrfsystem AT brunnero firstbeamcommissioningofthe400mhzlhcrfsystem AT ciapalaedmond firstbeamcommissioningofthe400mhzlhcrfsystem AT dubouchetf firstbeamcommissioningofthe400mhzlhcrfsystem AT hoflewolfgang firstbeamcommissioningofthe400mhzlhcrfsystem AT linnecartpr firstbeamcommissioningofthe400mhzlhcrfsystem AT maesenp firstbeamcommissioningofthe400mhzlhcrfsystem AT molendijkjc firstbeamcommissioningofthe400mhzlhcrfsystem AT shaposhnikovaen firstbeamcommissioningofthe400mhzlhcrfsystem AT tuckmanteljoachim firstbeamcommissioningofthe400mhzlhcrfsystem AT valuchd firstbeamcommissioningofthe400mhzlhcrfsystem AT wehrleu firstbeamcommissioningofthe400mhzlhcrfsystem AT weierudf firstbeamcommissioningofthe400mhzlhcrfsystem |