First Beam Commissioning of the 400 MHz LHC RF System
Hardware commissioning of the LHC RF system was successfully completed in time for first beams in LHC in September 2008. All cavities ware conditioned to nominal field, power systems tested and all Low level synchronization systems, cavity controllers and beam control electronics were tested and cal...
Autores principales: | Butterworth, A C, Angoletta, M E, Arnaudon, L, Baudrenghien, P, Bohl, T, Brunner, O, Ciapala, Edmond, Dubouchet, F, Höfle, Wolfgang, Linnecar, T P R, Maesen, P, Molendijk, J C, Shaposhnikova, E N, Tückmantel, Joachim, Valuch, D, Wehrle, U, Weierud, F |
---|---|
Lenguaje: | eng |
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1212921 |
Ejemplares similares
-
Commissioning of the 400 MHz LHC RF System
por: Ciapala, Edmond, et al.
Publicado: (2008) -
Hardware and Initial Beam Commissioning of the LHC RF Systems
por: Linnecar, T, et al.
Publicado: (2008) -
Status and commissioning plans for LHC Run 2. The RF system.
por: Baudrenghien, P, et al.
Publicado: (2014) -
The LHC RF System - Experience with beam operation
por: Baudrenghien, P, et al.
Publicado: (2011) -
Control of the LHC 400 MHz RF System (ACS)
por: Arnaudon, L, et al.
Publicado: (2004)