Cargando…
Achievements in CTF3 and Commissioning status
The aim of the latest CLIC test facility CTF3, built at CERN by an international collaboration, is to prove the main feasibility issues of the CLIC two-beam acceleration technology. Several of the main goals have been already achieved in the past years, like the full-loading linac operation mode and...
Autores principales: | , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1212966 |
Sumario: | The aim of the latest CLIC test facility CTF3, built at CERN by an international collaboration, is to prove the main feasibility issues of the CLIC two-beam acceleration technology. Several of the main goals have been already achieved in the past years, like the full-loading linac operation mode and the delay loop principle. During 2008 also the combiner ring concept has been experimentally proven and the recombined beam has been used to generate the RF power. In parallel in the fall of the year also the probe beam line commissioning had started. |
---|