Achievements in CTF3 and Commissioning status
The aim of the latest CLIC test facility CTF3, built at CERN by an international collaboration, is to prove the main feasibility issues of the CLIC two-beam acceleration technology. Several of the main goals have been already achieved in the past years, like the full-loading linac operation mode and...
Autores principales: | Bettoni, S, Adli, E, Corsini, R, Dabrowski, A, Döbert, S, Manglunki, D, Skowronski, P, Tecker, F |
---|---|
Lenguaje: | eng |
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1212966 |
Ejemplares similares
-
CTF3 Combiner Ring Commissioning
por: Tecker, F, et al.
Publicado: (2007) -
Experimental Studies on Drive Beam Generation in CTF3
por: Corsini, R, et al.
Publicado: (2008) -
Status of the CTF3 commissioning
por: Corsini, R, et al.
Publicado: (2002) -
Status of the CTF3 commissioning
por: Corsini, R, et al.
Publicado: (2002) -
Measuring the longitudinal bunch profile at CTF3
por: Dabrowski, A E, et al.
Publicado: (2010)