Cargando…
ATLAS Great Lakes Tier-2 Computing and Muon Calibration Center Commissioning
Large-scale computing in ATLAS is based on a grid-linked system of tiered computing centers. The ATLAS Great Lakes Tier-2 came online in September 2006 and now is commissioning with full capacity to provide significant computing power and services to the USATLAS community. Our Tier-2 Center also hos...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1213141 |
_version_ | 1780918051189817344 |
---|---|
author | McKee, Shawn |
author_facet | McKee, Shawn |
author_sort | McKee, Shawn |
collection | CERN |
description | Large-scale computing in ATLAS is based on a grid-linked system of tiered computing centers. The ATLAS Great Lakes Tier-2 came online in September 2006 and now is commissioning with full capacity to provide significant computing power and services to the USATLAS community. Our Tier-2 Center also host the Michigan Muon Calibration Center which is responsible for daily calibrations of the ATLAS Monitored Drift Tubes for ATLAS endcap muon system. During the first LHC beam period in 2008 and following ATLAS global cosmic ray data taking period, the Calibration Center received a large data stream from the muon detector to derive the drift tube timing offsets and time-to-space functions with a turn-around time of 24 hours. We will present the Calibration Center commissioning status and our plan for the first LHC beam collisions in 2009. |
id | cern-1213141 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2009 |
record_format | invenio |
spelling | cern-12131412023-03-12T05:19:58Zhttp://cds.cern.ch/record/1213141engMcKee, ShawnATLAS Great Lakes Tier-2 Computing and Muon Calibration Center Commissioningphysics.ins-detLarge-scale computing in ATLAS is based on a grid-linked system of tiered computing centers. The ATLAS Great Lakes Tier-2 came online in September 2006 and now is commissioning with full capacity to provide significant computing power and services to the USATLAS community. Our Tier-2 Center also host the Michigan Muon Calibration Center which is responsible for daily calibrations of the ATLAS Monitored Drift Tubes for ATLAS endcap muon system. During the first LHC beam period in 2008 and following ATLAS global cosmic ray data taking period, the Calibration Center received a large data stream from the muon detector to derive the drift tube timing offsets and time-to-space functions with a turn-around time of 24 hours. We will present the Calibration Center commissioning status and our plan for the first LHC beam collisions in 2009.Large-scale computing in ATLAS is based on a grid-linked system of tiered computing centers. The ATLAS Great Lakes Tier-2 came online in September 2006 and now is commissioning with full capacity to provide significant computing power and services to the USATLAS community. Our Tier-2 Center also host the Michigan Muon Calibration Center which is responsible for daily calibrations of the ATLAS Monitored Drift Tubes for ATLAS endcap muon system. During the first LHC beam period in 2008 and following ATLAS global cosmic ray data taking period, the Calibration Center received a large data stream from the muon detector to derive the drift tube timing offsets and time-to-space functions with a turn-around time of 24 hours. We will present the Calibration Center commissioning status and our plan for the first LHC beam collisions in 2009.arXiv:0910.2878oai:cds.cern.ch:12131412009-10-16 |
spellingShingle | physics.ins-det McKee, Shawn ATLAS Great Lakes Tier-2 Computing and Muon Calibration Center Commissioning |
title | ATLAS Great Lakes Tier-2 Computing and Muon Calibration Center Commissioning |
title_full | ATLAS Great Lakes Tier-2 Computing and Muon Calibration Center Commissioning |
title_fullStr | ATLAS Great Lakes Tier-2 Computing and Muon Calibration Center Commissioning |
title_full_unstemmed | ATLAS Great Lakes Tier-2 Computing and Muon Calibration Center Commissioning |
title_short | ATLAS Great Lakes Tier-2 Computing and Muon Calibration Center Commissioning |
title_sort | atlas great lakes tier-2 computing and muon calibration center commissioning |
topic | physics.ins-det |
url | http://cds.cern.ch/record/1213141 |
work_keys_str_mv | AT mckeeshawn atlasgreatlakestier2computingandmuoncalibrationcentercommissioning |