Cargando…
Fine time alignment of the LHCb Inner Tracker with the LHC injection tests
In September 2008 and in June 2009, injection tests from the SPS to the LHC were performed. Bunches of order 5x10^9 protons were dumped onto a beam stopper (TED) located 350 meters upstream of LHCb. This produced a spray of ~10 GeV muons in the LHCb detector, allowing detailed studies on the signal...
Autores principales: | Knecht, M, Needham, M |
---|---|
Lenguaje: | eng |
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1217159 |
Ejemplares similares
-
Updated Occupancies for the LHCb Inner Tracker
por: Needham, M
Publicado: (2005) -
Software Alignment of the LHCb Inner Tracker Sensors
por: Maciuc, F
Publicado: (2010) -
Track Reconstruction in the LHCb Inner Tracker
por: Needham, Matthew
Publicado: (2009) -
Alignment of the Inner Tracker Stations Using First Data
por: Nicolas, L, et al.
Publicado: (2009) -
Inner and outer tracker occupancies in the light LHCb detector
por: Needham, M
Publicado: (2002)