Cargando…

Construction Status of Linac4

The civil engineering works of the Linac4 linear accelerator at CERN started in October 2008 and regular machine operation is foreseen for 2013. Linac4 will accelerate H−ions to an energy of 160 MeV for injection into the PS Booster (PSB). It will thus replace the ageing Linac2, which presently inje...

Descripción completa

Detalles Bibliográficos
Autores principales: Gerigk, F, Carli, C, Garoby, R, Hanke, K, Lombardi, A M, MacCaferri, R, Maury, S, Rossi, C, Vretenar, M
Lenguaje:eng
Publicado: 2009
Materias:
Acceso en línea:http://cds.cern.ch/record/1217612
_version_ 1780918160088629248
author Gerigk, F
Carli, C
Garoby, R
Hanke, K
Lombardi, A M
MacCaferri, R
Maury, S
Rossi, C
Vretenar, M
author_facet Gerigk, F
Carli, C
Garoby, R
Hanke, K
Lombardi, A M
MacCaferri, R
Maury, S
Rossi, C
Vretenar, M
author_sort Gerigk, F
collection CERN
description The civil engineering works of the Linac4 linear accelerator at CERN started in October 2008 and regular machine operation is foreseen for 2013. Linac4 will accelerate H−ions to an energy of 160 MeV for injection into the PS Booster (PSB). It will thus replace the ageing Linac2, which presently injects at 50 MeV into the PSB, and it will also represents the first step in the injector upgrade for the LHC aiming at increasing its luminosity. This paper reports on the status of the design and construction of the main machine elements, which will be installed in the linac tunnel from the beginning of 2012 onwards, on the progress of the civil engineering and on the ongoing activities at the Linac4 test stand.
id cern-1217612
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2009
record_format invenio
spelling cern-12176122019-09-30T06:29:59Zhttp://cds.cern.ch/record/1217612engGerigk, FCarli, CGaroby, RHanke, KLombardi, A MMacCaferri, RMaury, SRossi, CVretenar, MConstruction Status of Linac4Accelerators and Storage RingsThe civil engineering works of the Linac4 linear accelerator at CERN started in October 2008 and regular machine operation is foreseen for 2013. Linac4 will accelerate H−ions to an energy of 160 MeV for injection into the PS Booster (PSB). It will thus replace the ageing Linac2, which presently injects at 50 MeV into the PSB, and it will also represents the first step in the injector upgrade for the LHC aiming at increasing its luminosity. This paper reports on the status of the design and construction of the main machine elements, which will be installed in the linac tunnel from the beginning of 2012 onwards, on the progress of the civil engineering and on the ongoing activities at the Linac4 test stand.sLHC-PROJECT-Report-0027CERN-sLHC-PROJECT-Report-0027oai:cds.cern.ch:12176122009-05-04
spellingShingle Accelerators and Storage Rings
Gerigk, F
Carli, C
Garoby, R
Hanke, K
Lombardi, A M
MacCaferri, R
Maury, S
Rossi, C
Vretenar, M
Construction Status of Linac4
title Construction Status of Linac4
title_full Construction Status of Linac4
title_fullStr Construction Status of Linac4
title_full_unstemmed Construction Status of Linac4
title_short Construction Status of Linac4
title_sort construction status of linac4
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1217612
work_keys_str_mv AT gerigkf constructionstatusoflinac4
AT carlic constructionstatusoflinac4
AT garobyr constructionstatusoflinac4
AT hankek constructionstatusoflinac4
AT lombardiam constructionstatusoflinac4
AT maccaferrir constructionstatusoflinac4
AT maurys constructionstatusoflinac4
AT rossic constructionstatusoflinac4
AT vretenarm constructionstatusoflinac4