Cargando…
Precise Timing Adjustment for the ATLAS Level1 Endcap Muon Trigger System
The ATLAS level1 endcap muon trigger system consists of about 4000 Thin Gap Chambers (TGC) with 320,000 input electronics channels in order to find level1 trigger candidates for muons in both endcap regions. We had already adjusted channel-to-channel timing difference in overall TGC system with 1.2n...
Autores principales: | Suzuki, Y, Sasaki, O, Iwasaki, H, Ikeno, M, Ishino, M, Tanaka, S, Fukunaga, C, Tomoto, M, Sugimoto, T, Okumura, Y, Takahashi, Y, Hasegawa, S, Itoh, Y, Kishiki, S, Takeshita, T, Hasegawa, Y, Sugaya, Y, Kawamoto, T, Sakamoto, H, Oda, S, Kubota, T, Kessoku, K, Echizenya, Y, Kurashige, H, Ishikawa, A, Matsushita, T, Ochi, A, Omachi, C, Hayakawa, T, Nishiyama, T, Tarem, S, Kajomovitz, E, Ben Ami, S, Hershenhorn, A, Bressler, S, Benhammou, Ya, Etzion, E, Hod, N, Silver, Y, Lellouch, D, Levinson, L, Mikenberg, G |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2009
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2009-006.200 http://cds.cern.ch/record/1217944 |
Ejemplares similares
-
The Commissioning status and results of ATLAS Level1 Endcap Muon Trigger System
por: Okumura, Y, et al.
Publicado: (2008) -
Final Test at the Surface of the ATLAS Endcap Muon Trigger Chamber Electronics
por: Kubota, T, et al.
Publicado: (2007) -
The First Result of Global Commissioning of the ATLAS Endcap Muon Trigger System in ATLAS Cavern
por: Sugimoto, T, et al.
Publicado: (2007) -
Installation and Test of the ATLAS Muon Endcap Trigger Chamber Electronics
por: Nomoto, Hiroshi, et al.
Publicado: (2007) -
First-level endcap muon trigger system for ATLAS
por: Hasuko, K, et al.
Publicado: (2000)