Cargando…

View of the CPLEAR detector after installation of the Drift Chambers: the electronic cabling has still to be done

The picture has been made during the winter shutdown of 91-92. See also the picture 99-008.

Detalles Bibliográficos
Autor principal: M Droege
Lenguaje:ENG
Publicado: 1991
Acceso en línea:http://cds.cern.ch/record/1221368
Descripción
Sumario:The picture has been made during the winter shutdown of 91-92. See also the picture 99-008.