جاري التحميل…

View of the CPLEAR detector after installation of the Drift Chambers: the electronic cabling has still to be done

The picture has been made during the winter shutdown of 91-92. See also the picture 99-008.

التفاصيل البيبلوغرافية
المؤلف الرئيسي: M Droege
اللغة:ENG
منشور في: 1991
الوصول للمادة أونلاين:http://cds.cern.ch/record/1221368