Načítá se…

View of the CPLEAR detector after installation of the Drift Chambers: the electronic cabling has still to be done

The picture has been made during the winter shutdown of 91-92. See also the picture 99-008.

Podrobná bibliografie
Hlavní autor: M Droege
Jazyk:ENG
Vydáno: 1991
On-line přístup:http://cds.cern.ch/record/1221368