Načítá se…
View of the CPLEAR detector after installation of the Drift Chambers: the electronic cabling has still to be done
The picture has been made during the winter shutdown of 91-92. See also the picture 99-008.
Hlavní autor: | |
---|---|
Jazyk: | ENG |
Vydáno: |
1991
|
On-line přístup: | http://cds.cern.ch/record/1221368 |