Loading...

View of the CPLEAR detector after installation of the Drift Chambers: the electronic cabling has still to be done

The picture has been made during the winter shutdown of 91-92. See also the picture 99-008.

Bibliografiske detaljer
Hovedforfatter: M Droege
Sprog:ENG
Udgivet: 1991
Online adgang:http://cds.cern.ch/record/1221368