Φορτώνει…

View of the CPLEAR detector after installation of the Drift Chambers: the electronic cabling has still to be done

The picture has been made during the winter shutdown of 91-92. See also the picture 99-008.

Λεπτομέρειες βιβλιογραφικής εγγραφής
Κύριος συγγραφέας: M Droege
Γλώσσα:ENG
Έκδοση: 1991
Διαθέσιμο Online:http://cds.cern.ch/record/1221368