Φορτώνει…
View of the CPLEAR detector after installation of the Drift Chambers: the electronic cabling has still to be done
The picture has been made during the winter shutdown of 91-92. See also the picture 99-008.
Κύριος συγγραφέας: | |
---|---|
Γλώσσα: | ENG |
Έκδοση: |
1991
|
Διαθέσιμο Online: | http://cds.cern.ch/record/1221368 |