Ag lódáil…

View of the CPLEAR detector after installation of the Drift Chambers: the electronic cabling has still to be done

The picture has been made during the winter shutdown of 91-92. See also the picture 99-008.

Sonraí bibleagrafaíochta
Príomhchruthaitheoir: M Droege
Teanga:ENG
Foilsithe / Cruthaithe: 1991
Rochtain ar líne:http://cds.cern.ch/record/1221368