Cargando…
View of the CPLEAR detector after installation of the Drift Chambers: the electronic cabling has still to be done
The picture has been made during the winter shutdown of 91-92. See also the picture 99-007.
Autor principal: | |
---|---|
Lenguaje: | ENG |
Publicado: |
1991
|
Acceso en línea: | http://cds.cern.ch/record/1221369 |
Sumario: | The picture has been made during the winter shutdown of 91-92. See also the picture 99-007. |
---|