Đang tải…
View of the CPLEAR detector after installation of the Drift Chambers: the electronic cabling has still to be done
The picture has been made during the winter shutdown of 91-92. See also the picture 99-007.
Tác giả chính: | |
---|---|
Ngôn ngữ: | ENG |
Được phát hành: |
1991
|
Truy cập trực tuyến: | http://cds.cern.ch/record/1221369 |