Lataa…
Installation of the Drift Chambers (DC's) in the CPLEAR detector
The picture has been made during the winter shutdown of 91-92.
Päätekijä: | |
---|---|
Kieli: | ENG |
Julkaistu: |
1991
|
Linkit: | http://cds.cern.ch/record/1221370 |
The picture has been made during the winter shutdown of 91-92.
Päätekijä: | |
---|---|
Kieli: | ENG |
Julkaistu: |
1991
|
Linkit: | http://cds.cern.ch/record/1221370 |