ロード中…
Installation of the Drift Chambers (DC's) in the CPLEAR detector
The picture has been made during the winter shutdown of 91-92.
第一著者: | |
---|---|
言語: | ENG |
出版事項: |
1991
|
オンライン・アクセス: | http://cds.cern.ch/record/1221370 |
The picture has been made during the winter shutdown of 91-92.
第一著者: | |
---|---|
言語: | ENG |
出版事項: |
1991
|
オンライン・アクセス: | http://cds.cern.ch/record/1221370 |