載入...
Installation of the Drift Chambers (DC's) in the CPLEAR detector
The picture has been made during the winter shutdown of 91-92.
主要作者: | |
---|---|
語言: | ENG |
出版: |
1991
|
在線閱讀: | http://cds.cern.ch/record/1221370 |
The picture has been made during the winter shutdown of 91-92.
主要作者: | |
---|---|
語言: | ENG |
出版: |
1991
|
在線閱讀: | http://cds.cern.ch/record/1221370 |