Cargando…
Overview of the downstream side of the complete CPLEAR detector
The picture has been made during the winter shutdown of 91-92.
Autor principal: | M Droege |
---|---|
Lenguaje: | ENG |
Publicado: |
1991
|
Acceso en línea: | http://cds.cern.ch/record/1221371 |
Ejemplares similares
-
Installation of the end-caps of the CPLEAR detector
por: M. Droege
Publicado: (1991) -
Installation of the Drift Chambers (DC's) in the CPLEAR detector
por: M Droege
Publicado: (1991) -
Particle identification detector (PID) and Steamer Tubes (ST) mounted in the CPLEAR spectrometer. (View inside)
por: M. Droege
Publicado: (1991) -
View of the CPLEAR detector after installation of the Drift Chambers: the electronic cabling has still to be done
por: M Droege
Publicado: (1991) -
View of the CPLEAR detector after installation of the Drift Chambers: the electronic cabling has still to be done
por: M Droege
Publicado: (1991)