Cargando…

Design, Testing and Operation of the Modulator for the CTF3 Tail Clipper Kicker

The goal of the present CLIC Test Facility (CTF3) is to demonstrate the technical feasibility of specific key issues in the CLIC scheme. The extracted drive beam from the combiner ring (CR, of 35 A magnitude and 140 ns duration, is sent to the new CLic EXperimental area (CLEX). A Tail Clipper (TC) i...

Descripción completa

Detalles Bibliográficos
Autores principales: Barnes, M J, Fowler, T, Ravida, G
Lenguaje:eng
Publicado: 2009
Materias:
Acceso en línea:http://cds.cern.ch/record/1225494
_version_ 1780918390244769792
author Barnes, M J
Fowler, T
Ravida, G
author_facet Barnes, M J
Fowler, T
Ravida, G
author_sort Barnes, M J
collection CERN
description The goal of the present CLIC Test Facility (CTF3) is to demonstrate the technical feasibility of specific key issues in the CLIC scheme. The extracted drive beam from the combiner ring (CR, of 35 A magnitude and 140 ns duration, is sent to the new CLic EXperimental area (CLEX). A Tail Clipper (TC) is required, in the CR to CLEX transfer line, to allow the duration of the extracted beam pulse to be adjusted. Fours sets of striplines are used for the tail clipper, each consisting of a pair of deflector plates driven to equal potential but opposite polarity. The tail clipper kick must have a fast field risetime, of not more than 5 ns, in order to minimize uncontrolled beam loss. High voltage MOSFETs have been chosen to meet the demanding specifications for the semiconductor switches for the modulator of the tail clipper. This paper discusses the design of the modulator; measurement data obtained during testing and operation of the tail clipper is presented and analyzed.
id cern-1225494
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2009
record_format invenio
spelling cern-12254942023-07-20T15:03:37Zhttp://cds.cern.ch/record/1225494engBarnes, M JFowler, TRavida, GDesign, Testing and Operation of the Modulator for the CTF3 Tail Clipper KickerAccelerators and Storage RingsThe goal of the present CLIC Test Facility (CTF3) is to demonstrate the technical feasibility of specific key issues in the CLIC scheme. The extracted drive beam from the combiner ring (CR, of 35 A magnitude and 140 ns duration, is sent to the new CLic EXperimental area (CLEX). A Tail Clipper (TC) is required, in the CR to CLEX transfer line, to allow the duration of the extracted beam pulse to be adjusted. Fours sets of striplines are used for the tail clipper, each consisting of a pair of deflector plates driven to equal potential but opposite polarity. The tail clipper kick must have a fast field risetime, of not more than 5 ns, in order to minimize uncontrolled beam loss. High voltage MOSFETs have been chosen to meet the demanding specifications for the semiconductor switches for the modulator of the tail clipper. This paper discusses the design of the modulator; measurement data obtained during testing and operation of the tail clipper is presented and analyzed.CERN-ATS-2009-132CLIC-Note-783oai:cds.cern.ch:12254942009-07-31
spellingShingle Accelerators and Storage Rings
Barnes, M J
Fowler, T
Ravida, G
Design, Testing and Operation of the Modulator for the CTF3 Tail Clipper Kicker
title Design, Testing and Operation of the Modulator for the CTF3 Tail Clipper Kicker
title_full Design, Testing and Operation of the Modulator for the CTF3 Tail Clipper Kicker
title_fullStr Design, Testing and Operation of the Modulator for the CTF3 Tail Clipper Kicker
title_full_unstemmed Design, Testing and Operation of the Modulator for the CTF3 Tail Clipper Kicker
title_short Design, Testing and Operation of the Modulator for the CTF3 Tail Clipper Kicker
title_sort design, testing and operation of the modulator for the ctf3 tail clipper kicker
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1225494
work_keys_str_mv AT barnesmj designtestingandoperationofthemodulatorforthectf3tailclipperkicker
AT fowlert designtestingandoperationofthemodulatorforthectf3tailclipperkicker
AT ravidag designtestingandoperationofthemodulatorforthectf3tailclipperkicker