Operational Experience with LHC Collimation

A first sub-set of the collimation system has been installed for the 2008 first beam commissioning of the LHC. It included 88 collimators around the ring and the two injection lines. Each collimator has two jaws for which must be controlled and monitored with high precision. The LHC collimation syst...

Descripción completa

Detalles Bibliográficos
Autor principal: Assmann, R
Lenguaje:eng
Publicado: 2009
Materias:
Acceso en línea:http://cds.cern.ch/record/1227228
_version_ 1780918434777792512
author Assmann, R
author_facet Assmann, R
author_sort Assmann, R
collection CERN
description A first sub-set of the collimation system has been installed for the 2008 first beam commissioning of the LHC. It included 88 collimators around the ring and the two injection lines. Each collimator has two jaws for which must be controlled and monitored with high precision. The LHC collimation system was put into operation from July to October 2008. The installed system is described and first results from system operation without and with beam are presented. It is shown that the LHC collimation system achieved the specified accuracy and reproducibility of jaw positioning. Next steps in collimation commissioning are described and planned system upgrades for high beam intensities are outlined.
id cern-1227228
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2009
record_format invenio
spelling cern-12272282019-09-30T06:29:59Zhttp://cds.cern.ch/record/1227228engAssmann, ROperational Experience with LHC CollimationAccelerators and Storage RingsA first sub-set of the collimation system has been installed for the 2008 first beam commissioning of the LHC. It included 88 collimators around the ring and the two injection lines. Each collimator has two jaws for which must be controlled and monitored with high precision. The LHC collimation system was put into operation from July to October 2008. The installed system is described and first results from system operation without and with beam are presented. It is shown that the LHC collimation system achieved the specified accuracy and reproducibility of jaw positioning. Next steps in collimation commissioning are described and planned system upgrades for high beam intensities are outlined.CERN-ATS-2009-140oai:cds.cern.ch:12272282009-07-31
spellingShingle Accelerators and Storage Rings
Assmann, R
Operational Experience with LHC Collimation
title Operational Experience with LHC Collimation
title_full Operational Experience with LHC Collimation
title_fullStr Operational Experience with LHC Collimation
title_full_unstemmed Operational Experience with LHC Collimation
title_short Operational Experience with LHC Collimation
title_sort operational experience with lhc collimation
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1227228
work_keys_str_mv AT assmannr operationalexperiencewithlhccollimation