Cargando…
Commissioning of the CMS DT electronics under magnetic field
After several months of installation and commissioning of the CMS (Compact Muon Solenoid) DT (Drift Tube) electronics, the system has finally been operated under magnetic field during the so-called CRAFT (Cosmic Run at Four Tesla) exercise. Over 4 weeks, the full detector has been running continuous...
Autores principales: | Fernandez-Bedoya, C, Masetti, G |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2009
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2009-006.81 http://cds.cern.ch/record/1234871 |
Ejemplares similares
-
Commissioning and Early Measurements of the DT Muon Detector of CMS at the LHC
por: Perrotta, A
Publicado: (2008) -
CMS DT Upgrade The Sector Collector Relocation
por: Navarro Tobar, Alvaro, et al.
Publicado: (2015) -
Muon DT Upgrade
por: Fernandez Bedoya, Cristina
Publicado: (2011) -
Commissioning of the CMS Magnet
por: Campi, D, et al.
Publicado: (2007) -
CMS DT Chambers: Optimized Measurement of Cosmic Rays Crossing Time in absence of Magnetic Field
por: Benettoni, Massimo, et al.
Publicado: (2007)