Cargando…

Commissioning of the CSC Level 1 Trigger Optical Links at CMS

The Endcap Muon (EMU) Cathode Strip Chamber (CSC) detector at the CMS experiment at CERN has been fully installed and operational since summer of 2008. The system of 180 optical links connects the middle and upper levels of the CSC Level 1 Trigger chain. Design and commissioning of all optical links...

Descripción completa

Detalles Bibliográficos
Autores principales: Acosta, A, Di Giovanni, G P, Holmes, D, Madorsky, A, Matveev, M, Padley, P, Redjimi, L, Uvarov, L, Wang, D
Lenguaje:eng
Publicado: CERN 2009
Materias:
Acceso en línea:https://dx.doi.org/10.5170/CERN-2009-006.431
http://cds.cern.ch/record/1235851
_version_ 1780918557664608256
author Acosta, A
Di Giovanni, G P
Holmes, D
Madorsky, A
Matveev, M
Padley, P
Redjimi, L
Uvarov, L
Wang, D
author_facet Acosta, A
Di Giovanni, G P
Holmes, D
Madorsky, A
Matveev, M
Padley, P
Redjimi, L
Uvarov, L
Wang, D
author_sort Acosta, A
collection CERN
description The Endcap Muon (EMU) Cathode Strip Chamber (CSC) detector at the CMS experiment at CERN has been fully installed and operational since summer of 2008. The system of 180 optical links connects the middle and upper levels of the CSC Level 1 Trigger chain. Design and commissioning of all optical links present several challenges, including reliable clock distribution, link synchronization and alignment, status monitoring and system testing. We gained an extensive experience conducting various tests, participating in local and global cosmic runs and in initial stage of the LHC operation. In this paper we present our hardware, firmware and software solutions and first results of the optical link commissioning.
id cern-1235851
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2009
publisher CERN
record_format invenio
spelling cern-12358512019-09-30T06:29:59Zdoi:10.5170/CERN-2009-006.431http://cds.cern.ch/record/1235851engAcosta, ADi Giovanni, G PHolmes, DMadorsky, AMatveev, MPadley, PRedjimi, LUvarov, LWang, DCommissioning of the CSC Level 1 Trigger Optical Links at CMSDetectors and Experimental TechniquesThe Endcap Muon (EMU) Cathode Strip Chamber (CSC) detector at the CMS experiment at CERN has been fully installed and operational since summer of 2008. The system of 180 optical links connects the middle and upper levels of the CSC Level 1 Trigger chain. Design and commissioning of all optical links present several challenges, including reliable clock distribution, link synchronization and alignment, status monitoring and system testing. We gained an extensive experience conducting various tests, participating in local and global cosmic runs and in initial stage of the LHC operation. In this paper we present our hardware, firmware and software solutions and first results of the optical link commissioning.CERNoai:cds.cern.ch:12358512009
spellingShingle Detectors and Experimental Techniques
Acosta, A
Di Giovanni, G P
Holmes, D
Madorsky, A
Matveev, M
Padley, P
Redjimi, L
Uvarov, L
Wang, D
Commissioning of the CSC Level 1 Trigger Optical Links at CMS
title Commissioning of the CSC Level 1 Trigger Optical Links at CMS
title_full Commissioning of the CSC Level 1 Trigger Optical Links at CMS
title_fullStr Commissioning of the CSC Level 1 Trigger Optical Links at CMS
title_full_unstemmed Commissioning of the CSC Level 1 Trigger Optical Links at CMS
title_short Commissioning of the CSC Level 1 Trigger Optical Links at CMS
title_sort commissioning of the csc level 1 trigger optical links at cms
topic Detectors and Experimental Techniques
url https://dx.doi.org/10.5170/CERN-2009-006.431
http://cds.cern.ch/record/1235851
work_keys_str_mv AT acostaa commissioningofthecsclevel1triggeropticallinksatcms
AT digiovannigp commissioningofthecsclevel1triggeropticallinksatcms
AT holmesd commissioningofthecsclevel1triggeropticallinksatcms
AT madorskya commissioningofthecsclevel1triggeropticallinksatcms
AT matveevm commissioningofthecsclevel1triggeropticallinksatcms
AT padleyp commissioningofthecsclevel1triggeropticallinksatcms
AT redjimil commissioningofthecsclevel1triggeropticallinksatcms
AT uvarovl commissioningofthecsclevel1triggeropticallinksatcms
AT wangd commissioningofthecsclevel1triggeropticallinksatcms