The Control System for the Cryogenics in the LHC Tunnel [First Experience and Improvements]
The Large Hadron Collider (LHC) was commissioned at CERN and started operation with beams in 2008. Several months of operation in nominal cryogenic conditions have triggered an optimisation of the process functional analysis. This lead to a few revisions of the control logic, which were realised on-...
Autores principales: | Gomes, P, Blanco, E, Casas, J, Fluder, C, Fortescue, E, Le Roux, P, Penacoba, G, Pezzetti, M, Soubiran, M, Tovar, A, Zwalinski, L |
---|---|
Lenguaje: | eng |
Publicado: |
2010
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1235892 |
Ejemplares similares
-
The Development of the Control System for the Cryogenics in the LHC Tunnel
por: Fluder, C, et al.
Publicado: (2011) -
Validation of the Data Consolidation in Layout Database for the LHC Tunnel Cryogenics Controls Package
por: Tovar, A, et al.
Publicado: (2014) -
The Control System for the Cryogenics in the LHC Tunnel
por: Gomes, P, et al.
Publicado: (2008) -
Validation of the Data Consolidation in Layout Database for the LHC Tunnel Cryogenics Controls Upgrade
por: Tovar-Gonzalez, A, et al.
Publicado: (2014) -
Improved Software Production for the LHC Tunnel Cryogenics Control System
por: Fluder, C, et al.
Publicado: (2015)