Commissioning of the CMS Cryogenic System After Final Installation in the Underground Cavern

After having served for the surface tests of the Compact Muon Solenoid (CMS) magnet, the cold box and ancillaries of the CMS helium refrigerator have been dismantled, moved and re-installed in the USC55 cavern in 2007. The full re-commissioning in the cavern has been followed by several tests of the...

Descripción completa

Detalles Bibliográficos
Autores principales: Dupont, T, Courty, J C, Perinic, G
Lenguaje:eng
Publicado: 2010
Materias:
Acceso en línea:https://dx.doi.org/10.1063/1.3422381
http://cds.cern.ch/record/1235895
_version_ 1780918565528928256
author Dupont, T
Courty, J C
Perinic, G
author_facet Dupont, T
Courty, J C
Perinic, G
author_sort Dupont, T
collection CERN
description After having served for the surface tests of the Compact Muon Solenoid (CMS) magnet, the cold box and ancillaries of the CMS helium refrigerator have been dismantled, moved and re-installed in the USC55 cavern in 2007. The full re-commissioning in the cavern has been followed by several tests of the refrigerator to confirm its nominal performance before it was used for the magnet and detector tests in 2008. During these tests the safety modes of the refrigeration system have been tested and improved. After a nine-year project both, the magnet and the refrigeration system are now ready for the CMS operation.
id cern-1235895
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2010
record_format invenio
spelling cern-12358952019-09-30T06:29:59Zdoi:10.1063/1.3422381http://cds.cern.ch/record/1235895engDupont, TCourty, J CPerinic, GCommissioning of the CMS Cryogenic System After Final Installation in the Underground CavernAccelerators and Storage RingsAfter having served for the surface tests of the Compact Muon Solenoid (CMS) magnet, the cold box and ancillaries of the CMS helium refrigerator have been dismantled, moved and re-installed in the USC55 cavern in 2007. The full re-commissioning in the cavern has been followed by several tests of the refrigerator to confirm its nominal performance before it was used for the magnet and detector tests in 2008. During these tests the safety modes of the refrigeration system have been tested and improved. After a nine-year project both, the magnet and the refrigeration system are now ready for the CMS operation.CERN-ATS-2010-014oai:cds.cern.ch:12358952010-01-04
spellingShingle Accelerators and Storage Rings
Dupont, T
Courty, J C
Perinic, G
Commissioning of the CMS Cryogenic System After Final Installation in the Underground Cavern
title Commissioning of the CMS Cryogenic System After Final Installation in the Underground Cavern
title_full Commissioning of the CMS Cryogenic System After Final Installation in the Underground Cavern
title_fullStr Commissioning of the CMS Cryogenic System After Final Installation in the Underground Cavern
title_full_unstemmed Commissioning of the CMS Cryogenic System After Final Installation in the Underground Cavern
title_short Commissioning of the CMS Cryogenic System After Final Installation in the Underground Cavern
title_sort commissioning of the cms cryogenic system after final installation in the underground cavern
topic Accelerators and Storage Rings
url https://dx.doi.org/10.1063/1.3422381
http://cds.cern.ch/record/1235895
work_keys_str_mv AT dupontt commissioningofthecmscryogenicsystemafterfinalinstallationintheundergroundcavern
AT courtyjc commissioningofthecmscryogenicsystemafterfinalinstallationintheundergroundcavern
AT perinicg commissioningofthecmscryogenicsystemafterfinalinstallationintheundergroundcavern