Cargando…
This document concerns the impact of the delay in the installation of the Cryogenic Ring Line (CRL) on the contract for the interconnection work for the LHC cryo-magnets
Lenguaje: | eng fre |
---|---|
Publicado: |
2004
|
Acceso en línea: | http://cds.cern.ch/record/1236491 |
Ejemplares similares
-
Proposal for the award of a contract for the supply and installation of interconnecting pipework for the cryogenic system of the LHC
Publicado: (2000) -
Proposal to negotiate an amendment to an existing contract for the supply and installation of interconnecting pipework for cryogenics and cooling of the LHC
Publicado: (2003) -
Proposal for the Award of a Contract for the Supply and Installation of 12 Interconnecting Compound Lines for Cryogenic Helium for the LHC
Publicado: (2003) -
Handling and installation of the LHC Cryogenic Interconnecting Box (QUIC) in the Point 6 cavern.
por: Caterina BERTONE (TS-IC-HS)
Publicado: (2004) -
LHC Cryogenic Thermometer on Interconnection
por: Balle, Ch
Publicado: (2007)