Cargando…
ATLAS Silicon Tracker commissioning
The most important results obtained in the commissioning phase of the ATLAS SCT and Pixel detector are presented, togheter with the first results from the first pp collision taken in 2009.
Autor principal: | Morettini, P |
---|---|
Lenguaje: | eng |
Publicado: |
2010
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1240343 |
Ejemplares similares
-
Commissioning of the ATLAS Silicon Tracker with Cosmic Rays and Beam Data
por: Morettini, P
Publicado: (2010) -
Commissioning of the ATLAS Silicon Tracker
por: Robinson, D
Publicado: (2007) -
Commissioning the ATLAS Silicon Microstrip Tracker
por: García, J E
Publicado: (2008) -
Commissioning and first data with the ATLAS silicon microstrip tracker
por: Røhne, Ole Myren
Publicado: (2010) -
Commissioning and Calibrating the CMS Silicon Strip Tracker
por: Bainbridge, Robert, et al.
Publicado: (2007)