Cargando…
LHC and injectors schedule for the next decade
This document summarizes the schedule of the different machines during the next decade.
Autores principales: | Foraz, K, Myers, S |
---|---|
Lenguaje: | eng |
Publicado: |
2010
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1270537 |
Ejemplares similares
-
LS1 general planning and strategy for the LHC, LHC injectors
por: Foraz, K
Publicado: (2012) -
First LHC Shutdown: Coordination and Schedule Issues
por: Coupard, J, et al.
Publicado: (2010) -
What are the required maintenance and consolidation activities to run at design performance levels (injectors and LHC) until 2035?
por: Baird, S, et al.
Publicado: (2014) -
Installation scheduling
por: Foraz, K
Publicado: (2003) -
Schedule evolution during the life-time of the LHC project
por: Foraz, K, et al.
Publicado: (2007)