Progress towards the CLIC feasibility demonstration in CTF3
The objective of the CLIC Test Facility CTF3 is to demonstrate the key feasibility issues of the CLIC two-beam technology: the efficient generation of a very high current drive beam and its stable deceleration in 12 GHz resonant structures, to produce high-power RF pulses and accelerate the main bea...
Autores principales: | Skowronski, P, Bettoni, S, Corsini, R, Dabrowski, AE, Doebert, S, Dubrovskiy, A, Tecker, F, Ruber, R, Biscari, C, Farabolini, W |
---|---|
Lenguaje: | eng |
Publicado: |
2010
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1271363 |
Ejemplares similares
-
The CLIC feasibility demonstration in CTF3
por: Skowroński, P K, et al.
Publicado: (2011) -
Experimental Verifiction of the CLIC two beam Acceleration Technology in CTF3
por: Constance, B, et al.
Publicado: (2013) -
Beam Tests at the CLIC Test Facility, CTF3
por: Corsini, Roberto, et al.
Publicado: (2014) -
Review of the Drive Beam Stabilization in the CLIC Test Facility CTF3
por: Dubrovskiy, A, et al.
Publicado: (2013) -
Experimental Studies on Drive Beam Generation in CTF3
por: Corsini, R, et al.
Publicado: (2008)