Cargando…

Design of the Emittance Meter for the 3 and 12 MeV LINAC4 H- Beam

LINAC4 is part of the CERN LHC injector chain upgrade and will accelerate H- ions from 45 keV to 160 MeV. A movable diagnostics test bench will be used to adjust the machine parameters during different stages of installation. One of the main instruments on this movable bench is a transverse emittanc...

Descripción completa

Detalles Bibliográficos
Autores principales: Bravin, E, Cheymol, B, Gerard, D, Raich, U, Roncarolo, F
Lenguaje:eng
Publicado: 2010
Materias:
Acceso en línea:http://cds.cern.ch/record/1271723
_version_ 1780920228698390528
author Bravin, E
Cheymol, B
Gerard, D
Raich, U
Roncarolo, F
author_facet Bravin, E
Cheymol, B
Gerard, D
Raich, U
Roncarolo, F
author_sort Bravin, E
collection CERN
description LINAC4 is part of the CERN LHC injector chain upgrade and will accelerate H- ions from 45 keV to 160 MeV. A movable diagnostics test bench will be used to adjust the machine parameters during different stages of installation. One of the main instruments on this movable bench is a transverse emittance meter. Given the beam properties at 3 MeV and 12 MeV, the slit-grid system already developed for the measurements of the transverse emittance of the 45 keV H- source will not be suitable, mainly due to the high thermal load on the steel slit already with a single LINAC4 pulse. For this reason a new slit has been designed based on analytical and numerical simulations for different materials and geometries. The energy deposition patterns for the different cases have been simulated using FLUKA and will be presented in detail. In addition, the choice of wires for the SEM grid will be discussed, in terms of material, diameter and spacing required, to achieve the required measurement accuracy.
id cern-1271723
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2010
record_format invenio
spelling cern-12717232022-08-17T13:26:52Zhttp://cds.cern.ch/record/1271723engBravin, ECheymol, BGerard, DRaich, URoncarolo, FDesign of the Emittance Meter for the 3 and 12 MeV LINAC4 H- BeamAccelerators and Storage RingsLINAC4 is part of the CERN LHC injector chain upgrade and will accelerate H- ions from 45 keV to 160 MeV. A movable diagnostics test bench will be used to adjust the machine parameters during different stages of installation. One of the main instruments on this movable bench is a transverse emittance meter. Given the beam properties at 3 MeV and 12 MeV, the slit-grid system already developed for the measurements of the transverse emittance of the 45 keV H- source will not be suitable, mainly due to the high thermal load on the steel slit already with a single LINAC4 pulse. For this reason a new slit has been designed based on analytical and numerical simulations for different materials and geometries. The energy deposition patterns for the different cases have been simulated using FLUKA and will be presented in detail. In addition, the choice of wires for the SEM grid will be discussed, in terms of material, diameter and spacing required, to achieve the required measurement accuracy.CERN-BE-2010-013CERN-ATS-2010-107oai:cds.cern.ch:12717232010-05-01
spellingShingle Accelerators and Storage Rings
Bravin, E
Cheymol, B
Gerard, D
Raich, U
Roncarolo, F
Design of the Emittance Meter for the 3 and 12 MeV LINAC4 H- Beam
title Design of the Emittance Meter for the 3 and 12 MeV LINAC4 H- Beam
title_full Design of the Emittance Meter for the 3 and 12 MeV LINAC4 H- Beam
title_fullStr Design of the Emittance Meter for the 3 and 12 MeV LINAC4 H- Beam
title_full_unstemmed Design of the Emittance Meter for the 3 and 12 MeV LINAC4 H- Beam
title_short Design of the Emittance Meter for the 3 and 12 MeV LINAC4 H- Beam
title_sort design of the emittance meter for the 3 and 12 mev linac4 h- beam
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1271723
work_keys_str_mv AT bravine designoftheemittancemeterforthe3and12mevlinac4hbeam
AT cheymolb designoftheemittancemeterforthe3and12mevlinac4hbeam
AT gerardd designoftheemittancemeterforthe3and12mevlinac4hbeam
AT raichu designoftheemittancemeterforthe3and12mevlinac4hbeam
AT roncarolof designoftheemittancemeterforthe3and12mevlinac4hbeam