Cargando…
Single-batch filling of the CERN PS for LHC-type beams
Since the CERN PS Booster cannot simultaneously provide the beam brightness and intensity required, the nominal (25ns bunch spacing) proton beam for the LHC involves double-batch filling of the PS machine. Linac 4, which is under construction, will eventually remove this restriction. In the meantime...
Autores principales: | Carli, C, Comblin, JF, Findlay, A, Hancock, S, Hanke, K, Mikulec, B |
---|---|
Lenguaje: | eng |
Publicado: |
2010
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1272160 |
Ejemplares similares
-
Studies on single batch transfer of the LHC type beams between the CERN PS Booster and the PS
por: Blas, A, et al.
Publicado: (2009) -
LHC Beams from the CERN PS Booster
por: Mikulec, B, et al.
Publicado: (2009) -
Adjustment of the PS Beam Control for LHC Double-batch 50ns Spacing
por: Damerau, H, et al.
Publicado: (2011) -
Double batch filling in the PS
por: Daems, G, et al.
Publicado: (1994) -
High Intensity Beams from the CERN PS Booster
por: Mikulec, B, et al.
Publicado: (2009)