Operational experience during the LHC injection tests

Following the LHC injection tests of 2008. two injection tests took place in October and November 2009 as preparation for the LHC restart on November 20, 2009. During these injection tests beam was injected through the TI 2 transfer line into sector 23 of ring 1 and through TI 8 into the sectors 78,...

Descripción completa

Detalles Bibliográficos
Autores principales: Fuchsberger, K, Alemany-Fernandez, R, Arduini, G, Assmann, R, Bailey, R, Bruning, O, Goddard, B, Kain, V, Lamont, M, MacPherson, A, Meddahi, M, Papotti, G, Pojer, M, Ponce, L, Redaelli, S, Solfaroli Camillocci, M, Venturini Delsolaro, W, Wenninger, J
Lenguaje:eng
Publicado: 2010
Materias:
Acceso en línea:http://cds.cern.ch/record/1272162
_version_ 1780920234123722752
author Fuchsberger, K
Alemany-Fernandez, R
Arduini, G
Assmann, R
Bailey, R
Bruning, O
Goddard, B
Kain, V
Lamont, M
MacPherson, A
Meddahi, M
Papotti, G
Pojer, M
Ponce, L
Redaelli, S
Solfaroli Camillocci, M
Venturini Delsolaro, W
Wenninger, J
author_facet Fuchsberger, K
Alemany-Fernandez, R
Arduini, G
Assmann, R
Bailey, R
Bruning, O
Goddard, B
Kain, V
Lamont, M
MacPherson, A
Meddahi, M
Papotti, G
Pojer, M
Ponce, L
Redaelli, S
Solfaroli Camillocci, M
Venturini Delsolaro, W
Wenninger, J
author_sort Fuchsberger, K
collection CERN
description Following the LHC injection tests of 2008. two injection tests took place in October and November 2009 as preparation for the LHC restart on November 20, 2009. During these injection tests beam was injected through the TI 2 transfer line into sector 23 of ring 1 and through TI 8 into the sectors 78, 67 and 56 of ring 2. The beam time was dedicated to injection steering, optics measurements and debugging of all the systems involved. Because many potential problems were sorted out in advance, these tests contributed to the rapid progress after the restart. This paper describes the experiences and issues encountered during these tests as well as related measurement results.
id cern-1272162
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2010
record_format invenio
spelling cern-12721622022-08-17T13:28:00Zhttp://cds.cern.ch/record/1272162engFuchsberger, KAlemany-Fernandez, RArduini, GAssmann, RBailey, RBruning, OGoddard, BKain, VLamont, MMacPherson, AMeddahi, MPapotti, GPojer, MPonce, LRedaelli, SSolfaroli Camillocci, MVenturini Delsolaro, WWenninger, JOperational experience during the LHC injection testsAccelerators and Storage RingsFollowing the LHC injection tests of 2008. two injection tests took place in October and November 2009 as preparation for the LHC restart on November 20, 2009. During these injection tests beam was injected through the TI 2 transfer line into sector 23 of ring 1 and through TI 8 into the sectors 78, 67 and 56 of ring 2. The beam time was dedicated to injection steering, optics measurements and debugging of all the systems involved. Because many potential problems were sorted out in advance, these tests contributed to the rapid progress after the restart. This paper describes the experiences and issues encountered during these tests as well as related measurement results.CERN-ATS-2010-120oai:cds.cern.ch:12721622010-06-14
spellingShingle Accelerators and Storage Rings
Fuchsberger, K
Alemany-Fernandez, R
Arduini, G
Assmann, R
Bailey, R
Bruning, O
Goddard, B
Kain, V
Lamont, M
MacPherson, A
Meddahi, M
Papotti, G
Pojer, M
Ponce, L
Redaelli, S
Solfaroli Camillocci, M
Venturini Delsolaro, W
Wenninger, J
Operational experience during the LHC injection tests
title Operational experience during the LHC injection tests
title_full Operational experience during the LHC injection tests
title_fullStr Operational experience during the LHC injection tests
title_full_unstemmed Operational experience during the LHC injection tests
title_short Operational experience during the LHC injection tests
title_sort operational experience during the lhc injection tests
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1272162
work_keys_str_mv AT fuchsbergerk operationalexperienceduringthelhcinjectiontests
AT alemanyfernandezr operationalexperienceduringthelhcinjectiontests
AT arduinig operationalexperienceduringthelhcinjectiontests
AT assmannr operationalexperienceduringthelhcinjectiontests
AT baileyr operationalexperienceduringthelhcinjectiontests
AT bruningo operationalexperienceduringthelhcinjectiontests
AT goddardb operationalexperienceduringthelhcinjectiontests
AT kainv operationalexperienceduringthelhcinjectiontests
AT lamontm operationalexperienceduringthelhcinjectiontests
AT macphersona operationalexperienceduringthelhcinjectiontests
AT meddahim operationalexperienceduringthelhcinjectiontests
AT papottig operationalexperienceduringthelhcinjectiontests
AT pojerm operationalexperienceduringthelhcinjectiontests
AT poncel operationalexperienceduringthelhcinjectiontests
AT redaellis operationalexperienceduringthelhcinjectiontests
AT solfarolicamilloccim operationalexperienceduringthelhcinjectiontests
AT venturinidelsolarow operationalexperienceduringthelhcinjectiontests
AT wenningerj operationalexperienceduringthelhcinjectiontests