Cargando…
Operational experience during the LHC injection tests
Following the LHC injection tests of 2008. two injection tests took place in October and November 2009 as preparation for the LHC restart on November 20, 2009. During these injection tests beam was injected through the TI 2 transfer line into sector 23 of ring 1 and through TI 8 into the sectors 78,...
Autores principales: | , , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2010
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1272162 |
_version_ | 1780920234123722752 |
---|---|
author | Fuchsberger, K Alemany-Fernandez, R Arduini, G Assmann, R Bailey, R Bruning, O Goddard, B Kain, V Lamont, M MacPherson, A Meddahi, M Papotti, G Pojer, M Ponce, L Redaelli, S Solfaroli Camillocci, M Venturini Delsolaro, W Wenninger, J |
author_facet | Fuchsberger, K Alemany-Fernandez, R Arduini, G Assmann, R Bailey, R Bruning, O Goddard, B Kain, V Lamont, M MacPherson, A Meddahi, M Papotti, G Pojer, M Ponce, L Redaelli, S Solfaroli Camillocci, M Venturini Delsolaro, W Wenninger, J |
author_sort | Fuchsberger, K |
collection | CERN |
description | Following the LHC injection tests of 2008. two injection tests took place in October and November 2009 as preparation for the LHC restart on November 20, 2009. During these injection tests beam was injected through the TI 2 transfer line into sector 23 of ring 1 and through TI 8 into the sectors 78, 67 and 56 of ring 2. The beam time was dedicated to injection steering, optics measurements and debugging of all the systems involved. Because many potential problems were sorted out in advance, these tests contributed to the rapid progress after the restart. This paper describes the experiences and issues encountered during these tests as well as related measurement results. |
id | cern-1272162 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2010 |
record_format | invenio |
spelling | cern-12721622022-08-17T13:28:00Zhttp://cds.cern.ch/record/1272162engFuchsberger, KAlemany-Fernandez, RArduini, GAssmann, RBailey, RBruning, OGoddard, BKain, VLamont, MMacPherson, AMeddahi, MPapotti, GPojer, MPonce, LRedaelli, SSolfaroli Camillocci, MVenturini Delsolaro, WWenninger, JOperational experience during the LHC injection testsAccelerators and Storage RingsFollowing the LHC injection tests of 2008. two injection tests took place in October and November 2009 as preparation for the LHC restart on November 20, 2009. During these injection tests beam was injected through the TI 2 transfer line into sector 23 of ring 1 and through TI 8 into the sectors 78, 67 and 56 of ring 2. The beam time was dedicated to injection steering, optics measurements and debugging of all the systems involved. Because many potential problems were sorted out in advance, these tests contributed to the rapid progress after the restart. This paper describes the experiences and issues encountered during these tests as well as related measurement results.CERN-ATS-2010-120oai:cds.cern.ch:12721622010-06-14 |
spellingShingle | Accelerators and Storage Rings Fuchsberger, K Alemany-Fernandez, R Arduini, G Assmann, R Bailey, R Bruning, O Goddard, B Kain, V Lamont, M MacPherson, A Meddahi, M Papotti, G Pojer, M Ponce, L Redaelli, S Solfaroli Camillocci, M Venturini Delsolaro, W Wenninger, J Operational experience during the LHC injection tests |
title | Operational experience during the LHC injection tests |
title_full | Operational experience during the LHC injection tests |
title_fullStr | Operational experience during the LHC injection tests |
title_full_unstemmed | Operational experience during the LHC injection tests |
title_short | Operational experience during the LHC injection tests |
title_sort | operational experience during the lhc injection tests |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1272162 |
work_keys_str_mv | AT fuchsbergerk operationalexperienceduringthelhcinjectiontests AT alemanyfernandezr operationalexperienceduringthelhcinjectiontests AT arduinig operationalexperienceduringthelhcinjectiontests AT assmannr operationalexperienceduringthelhcinjectiontests AT baileyr operationalexperienceduringthelhcinjectiontests AT bruningo operationalexperienceduringthelhcinjectiontests AT goddardb operationalexperienceduringthelhcinjectiontests AT kainv operationalexperienceduringthelhcinjectiontests AT lamontm operationalexperienceduringthelhcinjectiontests AT macphersona operationalexperienceduringthelhcinjectiontests AT meddahim operationalexperienceduringthelhcinjectiontests AT papottig operationalexperienceduringthelhcinjectiontests AT pojerm operationalexperienceduringthelhcinjectiontests AT poncel operationalexperienceduringthelhcinjectiontests AT redaellis operationalexperienceduringthelhcinjectiontests AT solfarolicamilloccim operationalexperienceduringthelhcinjectiontests AT venturinidelsolarow operationalexperienceduringthelhcinjectiontests AT wenningerj operationalexperienceduringthelhcinjectiontests |