Cargando…
Linac4 chopper line commissioning strategy
The report outlines the strategy for beam-based commissioning of the Linac4 3 MeV chopper line as currently scheduled to start in the second half of 2011 in the Test Stand Area. A dedicated temporary diagnostics test bench will complement the measurement devices foreseen for permanent installation i...
Autores principales: | Bellodi, G, Lallement, JB, Lombardi, AM, Posocco, PA, Sargsyan, E |
---|---|
Lenguaje: | eng |
Publicado: |
2010
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1274442 |
Ejemplares similares
-
Linac4 chopper line commissioning strategy
por: Bellodi, G, et al.
Publicado: (2010) -
Measurement Strategy for the CERN Linac4 chopper-line
por: Lallement, J B, et al.
Publicado: (2006) -
Emittance reconstruction technique for the Linac4 high energy commissioning
por: Lallement, JB, et al.
Publicado: (2012) -
Chopper Line Studies
por: Garcia Tudela, M, et al.
Publicado: (2010) -
A Pencil Beam for the Linac4 commissioning
por: Lallement, JB, et al.
Publicado: (2010)