Cargando…
Calibration of the BLM Response at 450 GeV by Beam Scraping with Roman Pots
This note reports on two calibrations of the conversion factor from the number of protons intercepted by a TOTEM Roman Pot (RP) to the dose measured in a Beam Loss Monitor (BLM) downstream of the RP station. The results are compared with a FLUKA simulation.
Autores principales: | Appleby, Robert, Assmann, Ralph, Deile, Mario, Kaspar, Jan, Redaelli, Stefano |
---|---|
Lenguaje: | eng |
Publicado: |
2010
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1275351 |
Ejemplares similares
-
Closest approach of roman pots to the beam
por: Redaelli, Stefano
Publicado: (2012) -
Roman Pot Insertions in High-Intensity Beams for the CT-PPS Project at LHC
por: Deile, Mario, et al.
Publicado: (2016) -
The Roman Pot for LHC
por: Oriunno, Marco, et al.
Publicado: (2006) -
The First 1 1/2 Years of TOTEM Roman Pot Operation at LHC
por: Deile, M., et al.
Publicado: (2011) -
Beam Coupling Impedance Measurement and Mitigation for a TOTEM Roman Pot
por: Deile, Mario, et al.
Publicado: (2008)