Beam Commissioning of the Injection Protection System of the LHC
The movable LHC injection protection devices in the SPS-to-LHC transfer lines and downstream of the injection kicker in the LHC were commissioned with low-intensity beam. The different beam-based alignment measurements used to determine the beam centre and size are described, together with the resul...
Autores principales: | , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2010
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1277672 |
_version_ | 1780920368925507584 |
---|---|
author | Bartmann, W Assmann, R Bracco, C Dehning, B Goddard, B Holzer, E B Kain, V Meddahi, M Nordt, A Redaelli, S Rossi, A Sapinski, M Wollmann, D |
author_facet | Bartmann, W Assmann, R Bracco, C Dehning, B Goddard, B Holzer, E B Kain, V Meddahi, M Nordt, A Redaelli, S Rossi, A Sapinski, M Wollmann, D |
author_sort | Bartmann, W |
collection | CERN |
description | The movable LHC injection protection devices in the SPS-to-LHC transfer lines and downstream of the injection kicker in the LHC were commissioned with low-intensity beam. The different beam-based alignment measurements used to determine the beam centre and size are described, together with the results of measurements of the transverse beam distribution at large amplitude. The system was set up with beam to its nominal settings and the protection level against various failures was determined by measuring the transmission and transverse distribution into the LHC. Beam loss levels for regular operation were also extrapolated. The results are compared with the expected device settings and protection level, and the implications for LHC operation discussed. |
id | cern-1277672 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2010 |
record_format | invenio |
spelling | cern-12776722022-08-17T13:32:54Zhttp://cds.cern.ch/record/1277672engBartmann, WAssmann, RBracco, CDehning, BGoddard, BHolzer, E BKain, VMeddahi, MNordt, ARedaelli, SRossi, ASapinski, MWollmann, DBeam Commissioning of the Injection Protection System of the LHCAccelerators and Storage RingsThe movable LHC injection protection devices in the SPS-to-LHC transfer lines and downstream of the injection kicker in the LHC were commissioned with low-intensity beam. The different beam-based alignment measurements used to determine the beam centre and size are described, together with the results of measurements of the transverse beam distribution at large amplitude. The system was set up with beam to its nominal settings and the protection level against various failures was determined by measuring the transmission and transverse distribution into the LHC. Beam loss levels for regular operation were also extrapolated. The results are compared with the expected device settings and protection level, and the implications for LHC operation discussed.CERN-ATS-2010-133oai:cds.cern.ch:12776722010-06-01 |
spellingShingle | Accelerators and Storage Rings Bartmann, W Assmann, R Bracco, C Dehning, B Goddard, B Holzer, E B Kain, V Meddahi, M Nordt, A Redaelli, S Rossi, A Sapinski, M Wollmann, D Beam Commissioning of the Injection Protection System of the LHC |
title | Beam Commissioning of the Injection Protection System of the LHC |
title_full | Beam Commissioning of the Injection Protection System of the LHC |
title_fullStr | Beam Commissioning of the Injection Protection System of the LHC |
title_full_unstemmed | Beam Commissioning of the Injection Protection System of the LHC |
title_short | Beam Commissioning of the Injection Protection System of the LHC |
title_sort | beam commissioning of the injection protection system of the lhc |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1277672 |
work_keys_str_mv | AT bartmannw beamcommissioningoftheinjectionprotectionsystemofthelhc AT assmannr beamcommissioningoftheinjectionprotectionsystemofthelhc AT braccoc beamcommissioningoftheinjectionprotectionsystemofthelhc AT dehningb beamcommissioningoftheinjectionprotectionsystemofthelhc AT goddardb beamcommissioningoftheinjectionprotectionsystemofthelhc AT holzereb beamcommissioningoftheinjectionprotectionsystemofthelhc AT kainv beamcommissioningoftheinjectionprotectionsystemofthelhc AT meddahim beamcommissioningoftheinjectionprotectionsystemofthelhc AT nordta beamcommissioningoftheinjectionprotectionsystemofthelhc AT redaellis beamcommissioningoftheinjectionprotectionsystemofthelhc AT rossia beamcommissioningoftheinjectionprotectionsystemofthelhc AT sapinskim beamcommissioningoftheinjectionprotectionsystemofthelhc AT wollmannd beamcommissioningoftheinjectionprotectionsystemofthelhc |