Towards a Consolidation of LHC Superconducting Splices for 7 TeV Operation

Following the analysis of the September 2008 LHC incident, the assembly process and the quality assurance of the main 13 kA interconnection splices were improved, with new measurement and diagnostics methods introduced. During the 2008-2009 shutdown ~5% of these 10 000 splices were newly assembled w...

Descripción completa

Detalles Bibliográficos
Autores principales: Bertinelli, F, Catalan Lasheras, N, Fessia, P, Garion, C, Mathot, S, Perin, A, Scheuerlein, C, Sgobba, S, ten Kat, H, Tock, J P, Verweij, A, Willering, G
Lenguaje:eng
Publicado: 2010
Materias:
Acceso en línea:http://cds.cern.ch/record/1277711
_version_ 1780920376032755712
author Bertinelli, F
Catalan Lasheras, N
Fessia, P
Garion, C
Mathot, S
Perin, A
Scheuerlein, C
Sgobba, S
ten Kat, H
Tock, J P
Verweij, A
Willering, G
author_facet Bertinelli, F
Catalan Lasheras, N
Fessia, P
Garion, C
Mathot, S
Perin, A
Scheuerlein, C
Sgobba, S
ten Kat, H
Tock, J P
Verweij, A
Willering, G
author_sort Bertinelli, F
collection CERN
description Following the analysis of the September 2008 LHC incident, the assembly process and the quality assurance of the main 13 kA interconnection splices were improved, with new measurement and diagnostics methods introduced. During the 2008-2009 shutdown ~5% of these 10 000 splices were newly assembled with these improvements implemented, but essentially maintaining the original design. It is known today that a limiting factor towards 7 TeV operation is the normal conducting resistance of ~15% of the original main 13 kA interconnection splices, associated to the electrical continuity of the copper stabiliser. A “Splices Task Force” has been set up at CERN to evaluate the need for, develop and test design improvements and prepare the implementation of a consolidation campaign. Important issues of splice design, process choice, resources and time requirements are considered.
id cern-1277711
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2010
record_format invenio
spelling cern-12777112022-08-17T13:32:56Zhttp://cds.cern.ch/record/1277711engBertinelli, FCatalan Lasheras, NFessia, PGarion, CMathot, SPerin, AScheuerlein, CSgobba, Sten Kat, HTock, J PVerweij, AWillering, GTowards a Consolidation of LHC Superconducting Splices for 7 TeV OperationAccelerators and Storage RingsFollowing the analysis of the September 2008 LHC incident, the assembly process and the quality assurance of the main 13 kA interconnection splices were improved, with new measurement and diagnostics methods introduced. During the 2008-2009 shutdown ~5% of these 10 000 splices were newly assembled with these improvements implemented, but essentially maintaining the original design. It is known today that a limiting factor towards 7 TeV operation is the normal conducting resistance of ~15% of the original main 13 kA interconnection splices, associated to the electrical continuity of the copper stabiliser. A “Splices Task Force” has been set up at CERN to evaluate the need for, develop and test design improvements and prepare the implementation of a consolidation campaign. Important issues of splice design, process choice, resources and time requirements are considered.CERN-ATS-2010-144oai:cds.cern.ch:12777112010-06-01
spellingShingle Accelerators and Storage Rings
Bertinelli, F
Catalan Lasheras, N
Fessia, P
Garion, C
Mathot, S
Perin, A
Scheuerlein, C
Sgobba, S
ten Kat, H
Tock, J P
Verweij, A
Willering, G
Towards a Consolidation of LHC Superconducting Splices for 7 TeV Operation
title Towards a Consolidation of LHC Superconducting Splices for 7 TeV Operation
title_full Towards a Consolidation of LHC Superconducting Splices for 7 TeV Operation
title_fullStr Towards a Consolidation of LHC Superconducting Splices for 7 TeV Operation
title_full_unstemmed Towards a Consolidation of LHC Superconducting Splices for 7 TeV Operation
title_short Towards a Consolidation of LHC Superconducting Splices for 7 TeV Operation
title_sort towards a consolidation of lhc superconducting splices for 7 tev operation
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1277711
work_keys_str_mv AT bertinellif towardsaconsolidationoflhcsuperconductingsplicesfor7tevoperation
AT catalanlasherasn towardsaconsolidationoflhcsuperconductingsplicesfor7tevoperation
AT fessiap towardsaconsolidationoflhcsuperconductingsplicesfor7tevoperation
AT garionc towardsaconsolidationoflhcsuperconductingsplicesfor7tevoperation
AT mathots towardsaconsolidationoflhcsuperconductingsplicesfor7tevoperation
AT perina towardsaconsolidationoflhcsuperconductingsplicesfor7tevoperation
AT scheuerleinc towardsaconsolidationoflhcsuperconductingsplicesfor7tevoperation
AT sgobbas towardsaconsolidationoflhcsuperconductingsplicesfor7tevoperation
AT tenkath towardsaconsolidationoflhcsuperconductingsplicesfor7tevoperation
AT tockjp towardsaconsolidationoflhcsuperconductingsplicesfor7tevoperation
AT verweija towardsaconsolidationoflhcsuperconductingsplicesfor7tevoperation
AT willeringg towardsaconsolidationoflhcsuperconductingsplicesfor7tevoperation