Cargando…

Design, Manufacturing and Testing of the CTF3 Tail Clipper Kicker

The goal of the present CLIC Test Facility (CTF3) is to demonstrate the technical feasibility of specific key issues of the CLIC scheme. The extracted drive beam from the combiner ring (CR), a pulse of 35 A magnitude and 140 ns duration, is sent to the new CLic EXperimental area (CLEX). A Tail Clipp...

Descripción completa

Detalles Bibliográficos
Autores principales: Barnes, M J, Fowler, T, Ravida, G, Rodriguez, I, Toral, F
Lenguaje:eng
Publicado: 2010
Materias:
Acceso en línea:http://cds.cern.ch/record/1280679
_version_ 1780920445543907328
author Barnes, M J
Fowler, T
Ravida, G
Rodriguez, I
Toral, F
author_facet Barnes, M J
Fowler, T
Ravida, G
Rodriguez, I
Toral, F
author_sort Barnes, M J
collection CERN
description The goal of the present CLIC Test Facility (CTF3) is to demonstrate the technical feasibility of specific key issues of the CLIC scheme. The extracted drive beam from the combiner ring (CR), a pulse of 35 A magnitude and 140 ns duration, is sent to the new CLic EXperimental area (CLEX). A Tail Clipper (TC) kicker is required, in the CR to CLEX transfer line, to allow the duration of the beam pulse to be adjusted: the unwanted bunches are kicked into a collimator. The TC must have a fast field rise-time, of not more than 5 ns, in order to minimize uncontrolled beam loss. Striplines are used for the TC: to establish the required fields, the applied pulse wave front must fully propagate along the striplines. To reduce the wave front propagation time, the overall length of the stripline assembly is sub-divided into 4 sections. The TC has been designed with the aid of detailed numerical modelling: the stripline cross-section and coaxial-to-stripline transitions were carefully optimized using a 3D code. The results of simulations and the measured behaviour of the striplines are presented; in addition measured current pulses are shown.
id cern-1280679
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2010
record_format invenio
spelling cern-12806792023-07-20T15:03:17Zhttp://cds.cern.ch/record/1280679engBarnes, M JFowler, TRavida, GRodriguez, IToral, FDesign, Manufacturing and Testing of the CTF3 Tail Clipper KickerAccelerators and Storage RingsThe goal of the present CLIC Test Facility (CTF3) is to demonstrate the technical feasibility of specific key issues of the CLIC scheme. The extracted drive beam from the combiner ring (CR), a pulse of 35 A magnitude and 140 ns duration, is sent to the new CLic EXperimental area (CLEX). A Tail Clipper (TC) kicker is required, in the CR to CLEX transfer line, to allow the duration of the beam pulse to be adjusted: the unwanted bunches are kicked into a collimator. The TC must have a fast field rise-time, of not more than 5 ns, in order to minimize uncontrolled beam loss. Striplines are used for the TC: to establish the required fields, the applied pulse wave front must fully propagate along the striplines. To reduce the wave front propagation time, the overall length of the stripline assembly is sub-divided into 4 sections. The TC has been designed with the aid of detailed numerical modelling: the stripline cross-section and coaxial-to-stripline transitions were carefully optimized using a 3D code. The results of simulations and the measured behaviour of the striplines are presented; in addition measured current pulses are shown.CERN-ATS-2010-163CLIC-Note-852oai:cds.cern.ch:12806792010-06-01
spellingShingle Accelerators and Storage Rings
Barnes, M J
Fowler, T
Ravida, G
Rodriguez, I
Toral, F
Design, Manufacturing and Testing of the CTF3 Tail Clipper Kicker
title Design, Manufacturing and Testing of the CTF3 Tail Clipper Kicker
title_full Design, Manufacturing and Testing of the CTF3 Tail Clipper Kicker
title_fullStr Design, Manufacturing and Testing of the CTF3 Tail Clipper Kicker
title_full_unstemmed Design, Manufacturing and Testing of the CTF3 Tail Clipper Kicker
title_short Design, Manufacturing and Testing of the CTF3 Tail Clipper Kicker
title_sort design, manufacturing and testing of the ctf3 tail clipper kicker
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1280679
work_keys_str_mv AT barnesmj designmanufacturingandtestingofthectf3tailclipperkicker
AT fowlert designmanufacturingandtestingofthectf3tailclipperkicker
AT ravidag designmanufacturingandtestingofthectf3tailclipperkicker
AT rodriguezi designmanufacturingandtestingofthectf3tailclipperkicker
AT toralf designmanufacturingandtestingofthectf3tailclipperkicker