Cargando…
Training in the Main LHC Dipoles Episode I: Evolution during Production, Quench Location, and Storage Time
In 2008, hardware commissioning of the LHC showed larger than expected loss of training retention for the magnets manufactured in Firm3. In this report we review the training data during surface test at SM18 along the production to point out difference between Firms. In particular, we study (i) the...
Autores principales: | Lorin, C, Todesco, E |
---|---|
Lenguaje: | eng |
Publicado: |
2010
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1280915 |
Ejemplares similares
-
Predicting the Quench Behavior of the LHC Dipoles during Commissioning
por: Lorin, C, et al.
Publicado: (2010) -
Training Quench Performance and Quench Location of the Short Superconducting Dipole Models for the LHC
por: Sanfilippo, S, et al.
Publicado: (2002) -
Conductor-Limited Quenches of LHC Superconducting Main Dipoles
por: Pojer, M, et al.
Publicado: (2005) -
Review of quench simulations for the protection of LHC main dipole magnets
por: Sonnemann, F, et al.
Publicado: (1999) -
Modeling of beam loss induced quenches in the LHC main dipole magnets
por: Breschi, Marco, et al.
Publicado: (2019)