Cargando…
Performance and LHC beam stability issue related to Q/Q' diagnostics and feedback systems
The baseline tune (Q) and chromaticity (Q’) diagnostics and associated feedback systems played a crucial role during the LHC commissioning, in establishing circulating beam, the first ramps and their fill-to-fill feed-forward correction. Early on, they also allowed to identify issues such as the res...
Autor principal: | Steinhagen, Ralph J |
---|---|
Lenguaje: | eng |
Publicado: |
2010
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1281616 |
Ejemplares similares
-
LHC Beam Stability and Performance of the Q/Q' Diagnostic Instrumentation
por: Gasior, M, et al.
Publicado: (2010) -
LHC Beam Stability and Feedback Control - Orbit and Energy -
por: Steinhagen, R J
Publicado: (2007) -
LHC Beam Stability and Feedback Control - Orbit and Energy -
por: Steinhagen, R J
Publicado: (2007) -
Commissioning and Initial Performance of the LHC Beam-Based Feedback Systems
por: Boccardi, A, et al.
Publicado: (2010) -
ORBIT FEEDBACK CONTROL FOR THE LHC Prototyping at the SPS
por: Steinhagen, Ralph J
Publicado: (2004)