The LHC beam loss monitoring system commissioning for 2010
The LHC Beam Loss Monitoring (BLM) system is one of the most complex instrumentation systems deployed in the LHC. In addition to protecting the collider, the system also needs to provide a means of diagnosing machine faults and deliver feedback of the losses to the control room as well as to several...
Autores principales: | , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2010
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1281617 |
_version_ | 1780920475028815872 |
---|---|
author | Zamantzas, C Dehning, B Chery, C Effinger, E Emery, J Grishin, S Hajdu, C F Holzer, E B Jackson, S Kurfuerst, C Marsili, A Nordt, A Sapinski, M Tissier, R Venturini, G G |
author_facet | Zamantzas, C Dehning, B Chery, C Effinger, E Emery, J Grishin, S Hajdu, C F Holzer, E B Jackson, S Kurfuerst, C Marsili, A Nordt, A Sapinski, M Tissier, R Venturini, G G |
author_sort | Zamantzas, C |
collection | CERN |
description | The LHC Beam Loss Monitoring (BLM) system is one of the most complex instrumentation systems deployed in the LHC. In addition to protecting the collider, the system also needs to provide a means of diagnosing machine faults and deliver feedback of the losses to the control room as well as to several systems for their setup and analysis. It has to transmit and process signals from approximately 4’000 monitors, and has nearly 3 million configurable parameters. This paper will discuss its performance and ability to provide the expected measurements, the problems encountered and necessary improvements, the adequacy of related software and databases, and in general its readiness and suitability for 3.5 TeV operation. |
id | cern-1281617 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2010 |
record_format | invenio |
spelling | cern-12816172021-01-26T15:12:05Zhttp://cds.cern.ch/record/1281617engZamantzas, CDehning, BChery, CEffinger, EEmery, JGrishin, SHajdu, C FHolzer, E BJackson, SKurfuerst, CMarsili, ANordt, ASapinski, MTissier, RVenturini, G GThe LHC beam loss monitoring system commissioning for 2010Accelerators and Storage RingsThe LHC Beam Loss Monitoring (BLM) system is one of the most complex instrumentation systems deployed in the LHC. In addition to protecting the collider, the system also needs to provide a means of diagnosing machine faults and deliver feedback of the losses to the control room as well as to several systems for their setup and analysis. It has to transmit and process signals from approximately 4’000 monitors, and has nearly 3 million configurable parameters. This paper will discuss its performance and ability to provide the expected measurements, the problems encountered and necessary improvements, the adequacy of related software and databases, and in general its readiness and suitability for 3.5 TeV operation.oai:cds.cern.ch:12816172010 |
spellingShingle | Accelerators and Storage Rings Zamantzas, C Dehning, B Chery, C Effinger, E Emery, J Grishin, S Hajdu, C F Holzer, E B Jackson, S Kurfuerst, C Marsili, A Nordt, A Sapinski, M Tissier, R Venturini, G G The LHC beam loss monitoring system commissioning for 2010 |
title | The LHC beam loss monitoring system commissioning for 2010 |
title_full | The LHC beam loss monitoring system commissioning for 2010 |
title_fullStr | The LHC beam loss monitoring system commissioning for 2010 |
title_full_unstemmed | The LHC beam loss monitoring system commissioning for 2010 |
title_short | The LHC beam loss monitoring system commissioning for 2010 |
title_sort | lhc beam loss monitoring system commissioning for 2010 |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1281617 |
work_keys_str_mv | AT zamantzasc thelhcbeamlossmonitoringsystemcommissioningfor2010 AT dehningb thelhcbeamlossmonitoringsystemcommissioningfor2010 AT cheryc thelhcbeamlossmonitoringsystemcommissioningfor2010 AT effingere thelhcbeamlossmonitoringsystemcommissioningfor2010 AT emeryj thelhcbeamlossmonitoringsystemcommissioningfor2010 AT grishins thelhcbeamlossmonitoringsystemcommissioningfor2010 AT hajducf thelhcbeamlossmonitoringsystemcommissioningfor2010 AT holzereb thelhcbeamlossmonitoringsystemcommissioningfor2010 AT jacksons thelhcbeamlossmonitoringsystemcommissioningfor2010 AT kurfuerstc thelhcbeamlossmonitoringsystemcommissioningfor2010 AT marsilia thelhcbeamlossmonitoringsystemcommissioningfor2010 AT nordta thelhcbeamlossmonitoringsystemcommissioningfor2010 AT sapinskim thelhcbeamlossmonitoringsystemcommissioningfor2010 AT tissierr thelhcbeamlossmonitoringsystemcommissioningfor2010 AT venturinigg thelhcbeamlossmonitoringsystemcommissioningfor2010 AT zamantzasc lhcbeamlossmonitoringsystemcommissioningfor2010 AT dehningb lhcbeamlossmonitoringsystemcommissioningfor2010 AT cheryc lhcbeamlossmonitoringsystemcommissioningfor2010 AT effingere lhcbeamlossmonitoringsystemcommissioningfor2010 AT emeryj lhcbeamlossmonitoringsystemcommissioningfor2010 AT grishins lhcbeamlossmonitoringsystemcommissioningfor2010 AT hajducf lhcbeamlossmonitoringsystemcommissioningfor2010 AT holzereb lhcbeamlossmonitoringsystemcommissioningfor2010 AT jacksons lhcbeamlossmonitoringsystemcommissioningfor2010 AT kurfuerstc lhcbeamlossmonitoringsystemcommissioningfor2010 AT marsilia lhcbeamlossmonitoringsystemcommissioningfor2010 AT nordta lhcbeamlossmonitoringsystemcommissioningfor2010 AT sapinskim lhcbeamlossmonitoringsystemcommissioningfor2010 AT tissierr lhcbeamlossmonitoringsystemcommissioningfor2010 AT venturinigg lhcbeamlossmonitoringsystemcommissioningfor2010 |