Cargando…

The LHC beam loss monitoring system commissioning for 2010

The LHC Beam Loss Monitoring (BLM) system is one of the most complex instrumentation systems deployed in the LHC. In addition to protecting the collider, the system also needs to provide a means of diagnosing machine faults and deliver feedback of the losses to the control room as well as to several...

Descripción completa

Detalles Bibliográficos
Autores principales: Zamantzas, C, Dehning, B, Chery, C, Effinger, E, Emery, J, Grishin, S, Hajdu, C F, Holzer, E B, Jackson, S, Kurfuerst, C, Marsili, A, Nordt, A, Sapinski, M, Tissier, R, Venturini, G G
Lenguaje:eng
Publicado: 2010
Materias:
Acceso en línea:http://cds.cern.ch/record/1281617
_version_ 1780920475028815872
author Zamantzas, C
Dehning, B
Chery, C
Effinger, E
Emery, J
Grishin, S
Hajdu, C F
Holzer, E B
Jackson, S
Kurfuerst, C
Marsili, A
Nordt, A
Sapinski, M
Tissier, R
Venturini, G G
author_facet Zamantzas, C
Dehning, B
Chery, C
Effinger, E
Emery, J
Grishin, S
Hajdu, C F
Holzer, E B
Jackson, S
Kurfuerst, C
Marsili, A
Nordt, A
Sapinski, M
Tissier, R
Venturini, G G
author_sort Zamantzas, C
collection CERN
description The LHC Beam Loss Monitoring (BLM) system is one of the most complex instrumentation systems deployed in the LHC. In addition to protecting the collider, the system also needs to provide a means of diagnosing machine faults and deliver feedback of the losses to the control room as well as to several systems for their setup and analysis. It has to transmit and process signals from approximately 4’000 monitors, and has nearly 3 million configurable parameters. This paper will discuss its performance and ability to provide the expected measurements, the problems encountered and necessary improvements, the adequacy of related software and databases, and in general its readiness and suitability for 3.5 TeV operation.
id cern-1281617
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2010
record_format invenio
spelling cern-12816172021-01-26T15:12:05Zhttp://cds.cern.ch/record/1281617engZamantzas, CDehning, BChery, CEffinger, EEmery, JGrishin, SHajdu, C FHolzer, E BJackson, SKurfuerst, CMarsili, ANordt, ASapinski, MTissier, RVenturini, G GThe LHC beam loss monitoring system commissioning for 2010Accelerators and Storage RingsThe LHC Beam Loss Monitoring (BLM) system is one of the most complex instrumentation systems deployed in the LHC. In addition to protecting the collider, the system also needs to provide a means of diagnosing machine faults and deliver feedback of the losses to the control room as well as to several systems for their setup and analysis. It has to transmit and process signals from approximately 4’000 monitors, and has nearly 3 million configurable parameters. This paper will discuss its performance and ability to provide the expected measurements, the problems encountered and necessary improvements, the adequacy of related software and databases, and in general its readiness and suitability for 3.5 TeV operation.oai:cds.cern.ch:12816172010
spellingShingle Accelerators and Storage Rings
Zamantzas, C
Dehning, B
Chery, C
Effinger, E
Emery, J
Grishin, S
Hajdu, C F
Holzer, E B
Jackson, S
Kurfuerst, C
Marsili, A
Nordt, A
Sapinski, M
Tissier, R
Venturini, G G
The LHC beam loss monitoring system commissioning for 2010
title The LHC beam loss monitoring system commissioning for 2010
title_full The LHC beam loss monitoring system commissioning for 2010
title_fullStr The LHC beam loss monitoring system commissioning for 2010
title_full_unstemmed The LHC beam loss monitoring system commissioning for 2010
title_short The LHC beam loss monitoring system commissioning for 2010
title_sort lhc beam loss monitoring system commissioning for 2010
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1281617
work_keys_str_mv AT zamantzasc thelhcbeamlossmonitoringsystemcommissioningfor2010
AT dehningb thelhcbeamlossmonitoringsystemcommissioningfor2010
AT cheryc thelhcbeamlossmonitoringsystemcommissioningfor2010
AT effingere thelhcbeamlossmonitoringsystemcommissioningfor2010
AT emeryj thelhcbeamlossmonitoringsystemcommissioningfor2010
AT grishins thelhcbeamlossmonitoringsystemcommissioningfor2010
AT hajducf thelhcbeamlossmonitoringsystemcommissioningfor2010
AT holzereb thelhcbeamlossmonitoringsystemcommissioningfor2010
AT jacksons thelhcbeamlossmonitoringsystemcommissioningfor2010
AT kurfuerstc thelhcbeamlossmonitoringsystemcommissioningfor2010
AT marsilia thelhcbeamlossmonitoringsystemcommissioningfor2010
AT nordta thelhcbeamlossmonitoringsystemcommissioningfor2010
AT sapinskim thelhcbeamlossmonitoringsystemcommissioningfor2010
AT tissierr thelhcbeamlossmonitoringsystemcommissioningfor2010
AT venturinigg thelhcbeamlossmonitoringsystemcommissioningfor2010
AT zamantzasc lhcbeamlossmonitoringsystemcommissioningfor2010
AT dehningb lhcbeamlossmonitoringsystemcommissioningfor2010
AT cheryc lhcbeamlossmonitoringsystemcommissioningfor2010
AT effingere lhcbeamlossmonitoringsystemcommissioningfor2010
AT emeryj lhcbeamlossmonitoringsystemcommissioningfor2010
AT grishins lhcbeamlossmonitoringsystemcommissioningfor2010
AT hajducf lhcbeamlossmonitoringsystemcommissioningfor2010
AT holzereb lhcbeamlossmonitoringsystemcommissioningfor2010
AT jacksons lhcbeamlossmonitoringsystemcommissioningfor2010
AT kurfuerstc lhcbeamlossmonitoringsystemcommissioningfor2010
AT marsilia lhcbeamlossmonitoringsystemcommissioningfor2010
AT nordta lhcbeamlossmonitoringsystemcommissioningfor2010
AT sapinskim lhcbeamlossmonitoringsystemcommissioningfor2010
AT tissierr lhcbeamlossmonitoringsystemcommissioningfor2010
AT venturinigg lhcbeamlossmonitoringsystemcommissioningfor2010