Cargando…
Collimators and beam cleaning: first results and future plans
The LHC collimation system has been used for beam cleaning and passive machine protection this year for the first time. The hardware commissioning tests carried out in preparation for operations with beam are presented. The setup procedure towards nominal injection settings is analyzed together with...
Autores principales: | Bracco, C, Assmann, R W, Redaelli, S, Rossi, A, Wollmann, D |
---|---|
Lenguaje: | eng |
Publicado: |
2010
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1281628 |
Ejemplares similares
-
Collimators and Beam Cleaning: First Results and Future Plans
por: Bracco, C, et al.
Publicado: (2010) -
Beam Commissioning Plan For LHC Collimation
por: Bracco, C, et al.
Publicado: (2009) -
First beam results for a collimator with in-jaw beam position monitors
por: Wollmann, D, et al.
Publicado: (2011) -
Beam Cleaning and Collimation Systems
por: Redaelli, S.
Publicado: (2016) -
BEAM COMMISSIONING PLAN FOR LHC COLLIMATION
por: Bracco, C, et al.
Publicado: (2009)