RF performance and operational issues
During the 2009 LHC run, a number of difficulties were encountered in the operation of the RF system and transverse damper. The main operational issues are presented, along with proposed or implemented solutions. The readiness of both systems for operation in 2010 is presented, including the prepara...
Autores principales: | , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2010
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1281640 |
Sumario: | During the 2009 LHC run, a number of difficulties were encountered in the operation of the RF system and transverse damper. The main operational issues are presented, along with proposed or implemented solutions. The readiness of both systems for operation in 2010 is presented, including the preparations necessary for running with unsafe beam. |
---|