RF performance and operational issues
During the 2009 LHC run, a number of difficulties were encountered in the operation of the RF system and transverse damper. The main operational issues are presented, along with proposed or implemented solutions. The readiness of both systems for operation in 2010 is presented, including the prepara...
Autores principales: | Butterworth, A, Arnaudon, L, Baudrenghien, P, Brunner, O, Ciapala, E, Hofle, W, Molendijk, J |
---|---|
Lenguaje: | eng |
Publicado: |
2010
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1281640 |
Ejemplares similares
-
RF Issues and Developments at the LHC Machine
por: Butterworth, A, et al.
Publicado: (2007) -
Operation experience with the LHC RF system
por: Arnaudon, L, et al.
Publicado: (2010) -
Commissioning of the 400 MHz LHC RF System
por: Ciapala, Edmond, et al.
Publicado: (2008) -
First Beam Commissioning of the 400 MHz LHC RF System
por: Butterworth, A C, et al.
Publicado: (2009) -
The LHC RF System - Experience with beam operation
por: Baudrenghien, P, et al.
Publicado: (2011)