Cargando…

RF performance and operational issues

During the 2009 LHC run, a number of difficulties were encountered in the operation of the RF system and transverse damper. The main operational issues are presented, along with proposed or implemented solutions. The readiness of both systems for operation in 2010 is presented, including the prepara...

Descripción completa

Detalles Bibliográficos
Autores principales: Butterworth, A, Arnaudon, L, Baudrenghien, P, Brunner, O, Ciapala, E, Hofle, W, Molendijk, J
Lenguaje:eng
Publicado: 2010
Materias:
Acceso en línea:http://cds.cern.ch/record/1281640

Ejemplares similares