Cargando…
2010 commissioning plans
2010 will see the continuation of LHC beam commissioning. This will lead into a period of extended operation at 3.5 TeV. The main objectives and outline of the second phase of beam commissioning are presented. The main aims and challenges of increasing the beam intensity are discussed.
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2010
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1281643 |
Sumario: | 2010 will see the continuation of LHC beam commissioning. This will lead into a period of extended operation at 3.5 TeV. The main objectives and outline of the second phase of beam commissioning are presented. The main aims and challenges of increasing the beam intensity are discussed. |
---|