Cargando…
2010 commissioning plans
2010 will see the continuation of LHC beam commissioning. This will lead into a period of extended operation at 3.5 TeV. The main objectives and outline of the second phase of beam commissioning are presented. The main aims and challenges of increasing the beam intensity are discussed.
Autor principal: | Lamont, M |
---|---|
Lenguaje: | eng |
Publicado: |
2010
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1281643 |
Ejemplares similares
-
Turning on the LHC: Commissioning with beam and the outlook for 2010
por: Lamont, M
Publicado: (2011) -
The LHC machine status, calibration run and commissioning plans
por: Lamont, Mike
Publicado: (2007) -
LHC Damper Beam commissioning in 2010
por: Höfle, W, et al.
Publicado: (2011) -
Evian 2010 Workshop on LHC Commissioning
por: Goddard, Brennan
Publicado: (2010) -
2015 Commissioning with Beam - Introduction
por: Lamont, M
Publicado: (2015)